Loading...
bld20140380 _Echelbarger-1.docx City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20140380 June 4, 2014 Project Name/Address: Echelbarger New Single Family Residence 1035 Main St Contact Person/Address/Fax: Tod Echelbarger todd@echelbarger.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov : Please Note: Building Handouts do not include updated Engineering Division Requirements. Refer to Engineering Handouts for all Engineering Requirements. Site Plan: 1. Please remove all the existing information from the site plan. All demo information is sufficiently shown on the tesc/grading plan. 2. The plot or site plan needs to show the location of all the proposed utilities (ie water line, sewer line, etc.) from the property line to the house and the detention system location and connection to the house but does not need to include the details (length, size, etc.). 3. Show final grades on this plan. 4. Please note the location of the nearest fire hydrant on plan and note the distance between the property line and the hydrant. 5. Please remove Note #3. The project does not have any replaced impervious surfaces by definition. See Handout E72 for more information. 6. Note #2 has no bearing on the construction or impervious surface calculations. Please remove. 7. Label sidewalk and call out width. 8. Call out landscape strip and width. 9. Show final driveway cut and extend landscape strip as necessary. Storm/Utility 1. Please remove all the existing information from the site plan. All demo information is sufficiently shown on the tesc/grading plan. It is difficult to provide a comprehensive review with so much conflicting information. 2. Sewer has a slope over 20%. If this can not be avoided, anchoring is required. Please note on plans and provide a detail for anchoring. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 12 3. It appears that a lateral connection will be made to the sewer main in the road. Please call out pipe size, material, and approximate slope. Sewer laterals are generally 6”. 4. Are footing drains required for this project? If so, please show where they will discharge. Footing drains can not be connected to the detention system. 5. Call out size of side sewer clean outs ( 4” at house and 6” at property line). Note that 6” clean out at property line shall have a 12” Cast Iron Locking Lid with ½” Hex Bolts. 6. In the Notes section on this sheet #6 does not appear to be consistent with the drawings. Please revise. 7. In the impervious surface calculation box, line 6 refers only to the regulated area and therefore should be the same as the total regulated amount on line 4. Please revise. Erosion/Grading 1. It is preferred that vegetation outside of the active construction area remain to provide natural erosion/sediment control. If it is possible, please note that “MU” area as a “No disturbance area”. 2. Rockeries shall be located a minimum distance back from the property line equal to the rockery wall height. Please call out distance from property line to proposed rockeries. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 22