bld20140613_Bell St Fourplex-4.docx
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.edmondswa.gov
PUBLIC WORKS DEPARTMENT
Engineering Division
Plan Review Corrections
th
Plan Check : 4 ReviewDate:January 22, 2015
# BLD20140613-
Project Name/Address:
622 Bell St – Phoenix United Multi Family 622 Bell St.
Contact Person/Address/Fax:
Randy Munson Randy.Munson@comcast.net
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.edmondswa.gov by choosing Permit Assistance:
GENERAL
1.Not Done. Please see attached cost estimate with redlines. Revise as needed. 40 lf of Cedar Fencing
included that is not shown on civils, 210 lf shown on landscape plan, revise all sheets and cost estimate
as needed to provide consistent information.
Thank you for providing a cost estimate, it is now under
review.
2.Done.
3.Done.
4.Done..
5.
Done.
SITE PLAN and LANDSCAPE PLAN
6.
Please revise site plan and landscape plan to reflect all revisions made in response to these comments.
STORM DRAINAGE
7.Done.
8.Done.
Separate Comments will follow
9.. Stormwater Engineer is reviewing-separate comments will follow. Please
provide a stormwater report including the requirements of Chapter 5 of the Edmonds Stormwater
CodeSupplement, (http://www.edmondswa.gov/images/COE/Government/Departments/Public_Works/Sto
rmwater_Utility/pdf/EdmondsStormwaterSupplementFinal20100428.pdf).
Separate Comments will follow
10.. Stormwater Engineer is reviewing-separate comments will follow. Please
provide an engineer designed stormwater system. Simplified Sizing Tools are not an option for Category 2
Small Sites.
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __
16
SHEET 1 OF 2: EROSION CONTROL (AND GRADING) PLAN
11.Done.
12.Done..
13.Done.
14.Done.
15.Done.
SHEET 2 OF 2: STORMWATER DRAINAGE (AND UTILITY) PLAN
Please do not change the note numbers on the plans. It makes the review process very difficult. If you
are not using a number anymore, please just put N/A or leave it blank. Add new numbers for anything
you are adding to the plan. Thank you!
16.Please revise Construction Notes as follows:
Not Done. Correct reqd slope to 2%
1-
Not Done. Correct pipe type, see Handout E72 A for acceptable detention pipe materials.
2-. States 85
ft of 30” pipe, plan shows 45. Change as necessary for new design
3-Done.
4-Done.
Not Done. E5.3 was removed but E5.4 was added. E5.4 is a detail of a type 2 catch basin, it does
5-
not have any reference information for this note. Please remove.
Remove detail E5.3 Control Structure
from this note. See comment #21 below. Revise note if necessary. Clarify what material will be used from
the control structure to the curbline.
6-Done.
7-Revise if necessary for new design.
Not done. This issue was addressed at our meeting and marked up on the plans you received.
8-
Reroute the downspout connection shown connecting to the middle of the east detention system.
Catch
basin cannot be connected to the center of the detention pipe. Please route to detention catch basin via new
line or by connecting to the tightline. Revise if necessary for new design.
9-10 ok
11-Okay.
Not DoneRevised note is incorrect. Should state 1 concrete d/w approach at 30’
12-. . Multi-family
driveway approaches can be a maximum of 24’to 30’ of the frontage. Plans show 32’. Please revise.
Not Done.Revise to include the length from property line to property line, 59.97 lf. The landscape
13-
strip needs to be labeled. There is a note id #26 regarding swales pointing to the west planter strip.
Remove it. There are no swales in the right of way.
Not done. A landscape strip is required between the
driveways and at the west and east ends of the property . Add “and landscape strip”
14-Done.
Not Done. See comment #18
15-. Not done. See handout E#37-revise note as needed
Not Done. Correction added: Revise curb installation length to 59.97.
16-
17-Done.
Not Done. Please add that the Romac Saddle to this note.
18- Please revise note to state “concrete” pipe.
(found using the “i” (information) icon on the gis map available to you on our website). Inserta Tee
connections are allowed but the ops division prefers a Romac Saddle. Please revise to use the saddle unless
there is a specific reason you do not think it is appropriate.
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __
26
19-ok
20-Done.
21-Done.
22-ok
Added Notes in 10/9/14 submittal:
Not Done. Inverts added but required 2% slope not attained. See Correction #33 for more
23-
information.
This note does not replace the requirement of providing inverts for the connection at the
lateral. Please interpolate approximate invert using the information available. (standard 3ft depth, 2%
slope, the invert stated on the plan for the existing m/h, use the gis map on our website for manhole and pipe
details using the “i” (information) option and selecting structures on the map).
24- Done.
-Not Done. The footing drains must connect to the 8” outflow pipe on private property. The line
25
cannot separately run through the right of way.
Not done. Add the correct details referenced and remove the details that are not applicable to this
***
project
. Not done. Also please remove details that do not apply to this project. Add all Standard Details to
the plans that are referenced in the above notes and in the drawings.
17.Done.
Not done. Detail added to L1 ok but plans do not show fencing around the dumpster area. Wall is
18.
called out at 1 – 3 feet tall so will not provide the required screening. Please revise plans to call out
the enclosure. It will need to be installed so that the interior area square footage remains 8 x 10 per
handout. Show the gates, when closed should be entirely on private property.
Not Done. Please
review the Handout for requirements and revise plans. Please call out concrete slab surface for trash
enclosure. Add note that drop pins and pavement sleeves are required for gates in the closed position and
the open position.
19.Done.
20.Received Waiver Request, in review. Driveways off the alley exceed the maximum allowed 14% slope per
Edmonds Community Development Code 18.80.060 D 1. Please review code section for criteria necessary
to possibly obtain a waiver for up to 20% slope.
21.Done.
22.Revised.
Not Done. See Correction #33. Revise as needed.
23.
FYI: If changes are made to reduce the size of the system by counting the mitigation with permeable
24.
pavers, a manufacturer’s detail for the pavers is required
. Done. But since in this submittal the pavers
are not being counted as pervious, the City has no requirements regarding how they are constructed and
installed. Please add to the Permeable Pavement detail the requirement that the base course of aggregate
shall have a minimum of 3” of storage and reference Handout E#72B all requirements.
25.Done. Call out rim and invert elevations for the existing CB on Bell St located northwest of the property.
Not Done. Revise to at minimum provide the option of standard material for this pipe, or specifically
26.
state on plans and in notes the conditions that the engineer sees existing that make DIP required and
the standard material for this application not sufficiently durable.
Not Done. Note #5 states DIP in the
right of way for the storm crossing. Please verify that the pipe will be getting less than 2ft of cover. If
there will be 2ft or more of cover then DIP is not required. Revise note if needed.
27.Done.
Not Done.Added length information is incorrect. Please revise.
28. See Comment #26 regarding material.
Note material and length of pipe from control structure to south catch basin.
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __
36
Not Done. As discuss in our meeting and on redlined plan, the footing drains must connect to private
29.
storm line within private property
. Not Done. Footing drains are required for this project. Please show
how they will connect to the stormwater outfall or make a connection to some other structure.
30.Done. Not Done. For 6” Clean out at property line “Metal Cap” is not sufficient. Also please consider how
difficult it will be in the future to repair a sewer line that is under a dumpster pad. Note 12” cast iron
lamphole cover with ½” hexbolts required.
31.Done.
Not Done. The inverts are added showing a pipe slope of .33% from west side clean out (87.20) to the
32.
clean out at property line (87.0) A slope of 2% is required. Clean out in east driveway in alley has no
invert called out. Also call out a traffic rated metal cap since in driving surface.
Not Done. Call out
inverts at lateral connection to Sewer Main at at cleanouts to verify 2% slope is achieved.
33.Done. See comment on Note # 24. Water line crosses the sewer line and where parallel there is less than
10ft separation. Please review Water Service Line Handout for separation and sleeving requirements.
Please revise drawings.
Other inconsistencies on plan sheet
.
-CB #2 does not include invert for 8” or 4” pipe connections
-CB #6 remove 6” invert and identify what pipe the third invert belongs to
-CB #5 add 4” invert
SHEET X OF X: FRONTAGE IMPROVEMENTS
Not done. Show the new sidewalk from property line to property line. Sawcut should be property
34.
line to property line. Make all changes to this plan (including the construction notes) when revising
sheet 4.
Not helpful. The frontage plan should not show underground piping or include call outs for the
utilities that are underground. It should show meters and cbs as final structures. There should be a call out
for the 2 ft sawcut. It should show the location of the required street trees. Call out width of sidewalk etc.
It should provide more information about the frontage improvements. Please add plan showing the frontage
improvements.
35.Not Applicable.
Not done. Call out landscape areas
36.. See # 34. Frontage shall include a 3’ landscape strip adjacent to curb
and 5’ sidewalk.
Not done.
37. Not Done. Show and note all information on the frontage plan. Two Street Trees are required
for this project and shall be placed as follows:
Note this requirement on the plans but amended to indicate replaced instead of removed
a.. The
existing street tree at the northeast corner of the property needs to be removed.
The City will accept the proposed configuration of a tree at each end of the property
b..
Measured from the northwest corner of the property, tree shall be placed at 15’ (between driveways)
and 35’(east of east driveway) measured on center.
Show these within the planter strip.
c. A 3’ x 3’ tree grate is required. I have attached an example of
a 4’ x 4’ tree grate to use as reference.
Note species.
d. Street tree species shall be a Capital or Chanticleer Pear, to be determined by Park
Department.
The following comments are provided by Jerry Shuster, Stormwater Engineer:
A separate response will follow from the Stormwater Engineer
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __
46
Subject: BLD20140613 -622 Bell St
Drainage Report
The second paragraph of page 1 says the project will have 3,990 square feet for the building footprint and the driveway plus
5,320
1,330 square feet of pavers. This total (not in the report) is square feet of impervious surface area. The third paragraph
5,2405,340
of page 1 says there will be square feet of impervious area. Sheet 1 of the plans say there will be square feet of
6,578
impervious area. The modeling has 0.151 acres of impervious area of square feet of impervious area. Re-calculate the
impervious surface area and make the number consistent between documents.
Minimum Requirement # 6 – Runoff treatment – Include the amount of pollution generating impervious surface planned for
the project.
Minimum Requirement # 7 – This section should say that this Category 2 Small Site project is located in Creek base (Shell
Creek) and is subject to the peak flow control standards of 0.07 cfs/ acre, 0.14 cfs/acre, and 0.33 cfs acre for the 2-yr, 10-yr,
and 100-yr recurrence events. Based on X,XXX square feet of proposed impervious area (fill in the amount based on the first
comment), the allowable peak discharge rates for the 2-yr, 10-yr, and 100-yr are x cfs, y cfs, and z cfs (calculate x, y and z by
multiplying the total impervious area in acres by the peak flow control standards). Re-model and re-design the detention
system as needed.
No text was found in the report that addresses Small Site Minimum Requirements #8, #9, #10, and #11. These requirements
shall be included.
Plans
Sheet 3:
Note 2 – CMP detention pipe is not per standard. Acceptable material for detention pipe are as follows:
Metal:
ACSP – Aluminized Corrugated Steel Pipe (Type 2 meets AASTO designations M274 and M36)
ASRP - Aluminum Spiral Ribbed Pipe (16 gauge or better)
CAP –Corrugated Aluminum Pipe (16 gauge or better)
DIP – Ductile Iron Pipe (Class 50 or better)
Concrete:
PCP – Plain Concrete pipe
RCP – Reinforced Concrete Pipe
Plastic:
PVCP – Polyvinyl Chloride Pipe (SDR 35 or better)
CPEP – Corrugated Polyethylene Pipe (smooth interior wall, or N-12® pipe)
RPP- Ribbed Polyvinylchloride Pipe
Pavers will have runoff during large storm events. Show how runoff from the paves enters the detention
system
Add a note that all pervious area will have compost amended soils per City handout E72C.
The new storm line from the detetion system to proposed CB#1 crossed a water line. Show the crossing in
profile to ensure no conflicts.
Sheet 5:
The two figures selected from the City policy on permeable pavement are for reference only and should not
be used as standard detail. Since these pavers are being counted as impervious and the detention system is
being sized to accept runoff of from them, no standard detail is necessary other than to indicate to the
contractor how they should be constructed.
Jerry Shuster, P.E.
Stormwater Engineering Program Manager
Jerry.Shuster@edmondswa.gov
425-771-0220 x1323
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __
56
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.