Loading...
bld20140634 Review Letter - Jantz Investment Change of Use.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:October 17, 2014 TO:Warren LaFon Warren LaFon -Architecture warrenlafon@earthlink.net FROM:Chris Rivera Engineering Technician RE:Plan Check #:ENG20140634 Project& Address :Jantz Change of Use –547Dayton Street During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a Permit Coordinator. City of Edmonds handouts and standard details can be referenced on the City website under Permit Assistance. Upon a site visit I found (3) separate catch basins (see attachedphotosand dimensions). It appears the existing storm water mitigation system is closely related topreviously approved plans (see attached plans,dated September2010). 1.Please correctthe layout of the existing detention system and catch basinswithinyour New Plan (sheet A-3) and 2.Please provide on the Site Plan (sheet A-1) all updated information regarding theexisting storm waterdetention system, catch basins, connections and downspouts. 3.Also, pleasestate on the Site Plan (sheet A-1) thelong term maintenance plan for cleaning out the catchbasins. Stateaccess to be provided forvactor trucksfor cleaning of those catch basins. Note:With the correct information regarding the storm water system displayed on your plans. rd The architecturalplans (New Plan, sheet A-3) will need to be modifiedshowing the 3catch basin on the exterior of the building and accessible away from structure walls and exit doors. Again thisinformation needs to be displayed on the Site Plan (sheet A-1) as well. Please contact me at 425-771-0220ext. 1339or by e-mailatchris.rivera@edmondswa.govif you have specific questions regarding these plan corrections.