bld20140634_Jantz Investment _ Change of Use.pdf
City of EdmondsBLD20140634
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.edmondswa.gov/
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Plan Review Comments
BLD20140634, 2014
PermitApplication:Date:
#July25
-Change of Use/Remodel547 Dayton St.
Project Name/Address:
Jantz Investment
warrenlafon@earthlink.net
Contact Person/Address, Fax or E-mail:
Warren LaFon
Reviewer: Chris RiveraDivision:
ENGINEERING
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.edmondswa.gov/under City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
1)Please add a note: Erosion control shall be provided to City of Edmonds standards.
2)Please add a note: Filter socks will be placed in catch basins within project vicinity as needed per
Edmonds Standard Detail E1.3.
3)Traffic Impact Analysis Worksheet.Refer to City handout E82.
Please providea
4)City records indicate a stormwatersystem exists beneath the asphalt parking within the property. Please
show within your site plan the stormwater detention systemand catch basins within the property lines (in
and outside of the existing garage).
a)Please show any re-routingandconnectionsto and from thestormwater system.
b)Please show a point of cleanout and provide a writtenplan for long-termmaintenance.
c)Please explain how the integrity of the stormwater system will/will not be affected?
5)Please show within your site plan the side sewer line and clean out from within the building connecting
to the sewer main.A clean out shall be provided at the edge of property line.
6)Please show on your site plan the location for construction staging.The right of way shall not be used for
this purpose.
7)A Right of Way Permit will be required for the use of the right of way while loading and unloading
material and equipment. Only temporary closures will be considered with prior approval from city,
Public Safety & Waste collection. Please apply for a Construction Right of Way permit if needed.
8)Please provide a traffic control plan with the Right of Way permit applicationfor the unloading and
loading of material and equipment within the right of way.
Please resubmit 3 copies of the revised plansand associated documents with a written response to each
item to a Permit Coordinator. Please contact me at 425-771-0220ext 1339or by e-mail at
chris.rivera@edmondswa.govif you have specific questions regarding these plan corrections.
DATE E-MAILED7/25/2014PAGE(1)