Loading...
BLD20140741 Plan Review Comments.pdf CE ITY OF DMONDS th •1215AN•E,WA98020 VENUE ORTH DMONDS P: 425.771.0220 • F: 425.771.0221 • W:www.edmondswa.gov HONEAXEB DSD:P•E•B EVELOPMENT ERVICES EPARTMENTLANNING NGINEERING UILDING August 27,2014 Mr. Rahil Karmali Email: Karmali.Rahil@gmail.com RE: PLAN REVIEW COMMENTSFOR PLANCHECK #BLD20140741 TH DAIRY QUEEN REMODELLOCATED AT 7530 212ST. SW Dear Mr. Karmali: I have reviewed the above building permit applicationfor the Planning Division,and it was found that the following information, corrections, or clarifications will need to be addressedbefore review can continue: Site Plan: 1.As requested in the Building Division’s comments, please provide a site plan. Refer to Handout #B57for guidance on items to be shown on the site plan.Please indicate all changes proposed to the exterior of the building and any changes proposed to the site itself on the site plan. Setbacks: 2.The minimum required street setback forthe Neighborhood Business(BN)zone is20 feet. For the subject site, the 20-foot streetsetback is measured from both the northern and western property lines. Please indicate these setback lines on your site plan in order to ensure that all proposed changes comply with these setback requirements. Based on the dimensions indicated on the site plan from when the building was originally constructed(BLD19960712), it appears that the building was constructed 20 feet from the northern property line, so there may not be sufficient space to construct the proposedcanopy over the drive-throughwindowwhile still complying with the applicable setback requirements. In addition to indicating the required 20-foot street setbacks from the northern and western property lines on the site plan,make any necessary changes to the proposal so that all new portions of the structure comply with the setback requirements. Lighting: 3.Your building elevations indicate LED/neon lighting around the canopy on the front of the building. Unfortunately, this is not something that can be permitted.Thesite is subject to the general design review requirements of Edmonds Community Development Code (ECDC)20.11. The only mention of lighting in ECDC 20.11 is in ECDC 20.11.030.B.8 which notes that lighting shall be the minimum necessary for safety and security.General design review projects are also subject to the Urban Design Standards of the Edmonds Comprehensive Plan.References with regard to lighting in the Comprehensive Plan talk about providing lighting for vehicles and pedestrians whileminimizing the potential for light to reflect or spill off site.Given these code and Comprehensive Plan references, the proposed LED/neon lighting around the front canopy cannot be approved.Please remove this lighting from the project plans. Height: 4.The maximum allowed height in the BN zone is 25 feet. It appears that the proposed chimney will comply with this requirement; however, please provide height calculations inorder to ensure compliance with the maximum allowed height. Refer to Handout #B41for guidanceon conducting height calculations.In addition to indicating the elevations of the original grade, maximum heightand proposed heighton the site plan, please also indicate them on the building elevation view. Elevation Views: 5.Thank you for providingcolor elevation viewsof the western, northern, and southern façades. Please also provide a color elevation view of the eastern façade. Signage: 6.Please note that signage requires a separate building permit application, so staff willnot bereviewing the proposed signage for compliance with applicable standards at this time. If you Page 1of 2 have any questions on the signage standardsfor the subject site(i.e. maximum size, height, illumination, etc.), you may contact the Planning Division at (425) 771-0220. Design Review: 7.Since you are proposing changes to the exterior of the building, design review is required. Design reviewwill be done administrativelyas part of the Planning Division’s review of your building permit application. Please note that a $225 design review fee will be added to your permit application fees, which can be paid at the time of permit issuance. Please submit three copies of your revised site plan (including one reduced copy) and two copies of any revised building plan sheets to a Development Services Permit Coordinator. Our office hours are Mondays, Tuesdays, Thursdays, and Fridays between 8:00 am and 4:30 pm, and Wednesdays between 8:00 am and noon. If you have any questions, feel freeto contact me at (425) 771-0220. Sincerely, Development Services Department -Planning Division JenMachuga Associate Planner Page 2of 2