bld20140942-Caryl-ADU-E1.pdf
CITY OF EDMONDS
PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE:October 9, 2014
TO:Van Caryl
vcaryl11@gmail.com
FROM:Jeanie McConnell, Engineering Program Manager
jeanie.mcconnell@edmondswa.gov
RE:Building Permit Application #:BLD20140942
th
Project& Address :Caryl ADU –15701 75Pl W
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to a Permit Coordinator.
City of Edmonds handouts and standard details can be referenced on the City website under Permit
Assistance.
1)The geotechnical evaluation prepared by PanGEO Inc., dated September 18, 2014, states “All
surface water from new impervious surfaces such as walkways, should be collected and carried
by way of a tightline to permanent discharge facilities”. Furthermore, ECDC 19.10.070.D
(Prohibitions under the Earth Subsidence and Landslide Hazard Areas section of the code)
states: “Because of the relationship of groundwater to stability, the discharge of collected
surface water or stormwater to the groundsurface or subsurface is prohibited on sites within the
earth subsidence and landslide hazard area.”
A storm drain easement is shown on the site plan, however, there doesn’t appear to be any
existing connections to this system.Please indicate on the plans how the surface water runoff
will be tightlined to permanent discharge facilities.