Loading...
bld20140943 - Post Office - Plumbing - E1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:October 15, 2014 TO:Best Plumbing Group Cindy.s@bestplumbing.com FROM:Jeanie McConnell, Engineering Program Manager jeanie.mcconnell@edmondswa.gov RE:Application#:bld20140943 Project:Post Office -Plumbing nd Project Address: 130 2AveN During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. City of Edmonds handouts,standard detailsand development codecan be referenced on the City website. Sheet P2.0U 1.Please include a detail in the plan set for the oil/water separator. Sheet P2.00 1.This plan sheet indicates the footing drainlines will pump to a rain leader line.The rain leaders connect to a storm detentionsystem on theexterior of the building andthat system was not designed to accept flows from the foundation drains. The civil construction plans indicate a separate drainpipe will be stubbed intothe SW corner of the building specifically for connection of thefooting drains. Please revise the plans to clearly indicate connection to the correct pipe system. 2.This plan sheet also indicates a 4”CW stub into the building, which is accurate for the fire line but not for domestic service. The domestic service is shown to be a 2”line according to the civil construction plans. The City’s building division is reviewingthis in more detail and will provided comments as needed. bld20140943 -Post Office -Plumbing -E1.docx Page 1of 1