CITY OF EDMONDS
PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE:October 15, 2014
TO:Best Plumbing Group
Cindy.s@bestplumbing.com
FROM:Jeanie McConnell, Engineering Program Manager
jeanie.mcconnell@edmondswa.gov
RE:Application#:bld20140943
Project:Post Office -Plumbing
nd
Project Address: 130 2AveN
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to a permit coordinator.
City of Edmonds handouts,standard detailsand development codecan be referenced on the City
website.
Sheet P2.0U
1.Please include a detail in the plan set for the oil/water separator.
Sheet P2.00
1.This plan sheet indicates the footing drainlines will pump to a rain leader line.The rain leaders
connect to a storm detentionsystem on theexterior of the building andthat system was not
designed to accept flows from the foundation drains. The civil construction plans indicate a
separate drainpipe will be stubbed intothe SW corner of the building specifically for
connection of thefooting drains. Please revise the plans to clearly indicate connection to the
correct pipe system.
2.This plan sheet also indicates a 4”CW stub into the building, which is accurate for the fire line
but not for domestic service. The domestic service is shown to be a 2”line according to the
civil construction plans. The City’s building division is reviewingthis in more detail and will
provided comments as needed.