BLD20141014_Pacific_Ridge_ENG3.pdf
City of EdmondsBLD20141014
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
PermitApplication:Date:
#BLD20141014March 18,2015
th
Project Name/Address:
Pacific Ridge –22303–95Ave W
Contact Person/Address, Fax or E-mail:
BNEAL@PACIFICRIDGEHOMES.COM
Reviewer: JENNIFERLAMBERTDivision:
ENGINEERING
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.edmondswa.govunder City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
st
1Review –11/19/14
nd
2Review –2/6/15
rd
3Review –3/18/15
SITE PLAN
General
1)OK
2)OK
3)OK
4)OK
WATER
1)OK
2)OK
3)OK
DATE E-MAILED3/18/2015PAGE (1)
City of EdmondsBLD20141014
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
SEWER
1)OK
2)OK
3)OK
4)OK
STORM
11/19/14 –Comments Below (For Storm)
1)OK
2)At this time the City will not continue review of the storm system until these items have been addressed.
3/18/15 –Since the items above have been addressed, below are the stormwater comments.
3)3/18/15 –Show the proposed stormwater system on the stormwater plan.
4)3/18/15–It is unclear what stormwater managementsystemis being proposed. The plansstate
that a drywell infiltration system is to be installed.
a)If the system is being designed from handout #E72Ba drywell cannot be used since the
infiltration rate must be a minimum of 0.5 in/hr. If the desired system is a drywell, the
system willneed to be designed by a licensed engineer.
b)If the system is being designed from handout #E72B, the size of the proposedinfiltration
systemisnot sized accurately.Please revise accordingly.
c)Please read Handout #E72B and show the systemdesignedbased on the infiltration rate
from the geotechnical engineerand as directed in the handout.
d)Or, the proposed system can be designed by a licensed engineer.If the system is to be
designed by a licensed engineer, please provide a report from the engineer and show the
system on the stormwater plan sheetfor review and approval.
DATE E-MAILED3/18/2015PAGE (2)
City of EdmondsBLD20141014
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
DRY UTILITIES
1)OK
TESC
1)OK
2)OK
3)OK
4)OK
5)OK
6)OK
Please resubmit 3 copies of the revised plansand associated documents with a written response to each
item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at
if you have specific questions regarding these plan corrections.
jennifer.lambert@ci.edmonds.wa.us
DATE E-MAILED3/18/2015PAGE (3)