Loading...
bld20141073_Kong-2.docx City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20141073 May 21, 2015 th Project Name/Address: New Carport 23422 76 Ave W Contact Person/Address/Fax: Kritsadang Kongsom Boot Kongsomboot@hotmail.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Permit Assistance and Handouts by #. Scroll down to find Engineering Handouts. REVIEW CORRECTIONS #2 Plan 1: Site Plan: 1. 5/21/15 Completed. 2. 5/21/15 Partially completed. Per Edmonds Community Development Code Section 18.30.060, any new development or redevelopment with more than 2,000 square feet of new impervious surfacing shall be required to provide storm water mitigation. New impervious surface is the roofline of a structure, concrete or pavement areas that have been constructed or proposed for construction after 1977. a. Please provide a breakdown of all impervious surface (see example below) on the site and the year each was constructed. b. If the total of the impervious surface constructed after 1977 is 2000sf or over, stormwater management is required. Please see Handout E72, E72A and E72B (on our website-see above) for stormwater management methods and requirements. The total amount of impervious surface to design for is 2536 sf. A stormwater infiltration system is shown on the plans but an infiltration rate report and testing results were not submitted. All Low Impact Development systems for runoff of impervious surface amounts over 2000 sf must be sized using a sizing rate based on the site’s infiltration rate. Please see the Handout E72B for more information. The Stormwater Supplement Appendix C describes the acceptable methods for obtaining infiltration rates. Once the site’s infiltration rate is determined then the rate and the impervious surface total can be used in the formula on page 9 of the E72B handout. If you choose to use a standard detention system instead, there is sizing based only on the amount of impervious surface available in the handout E72A. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 11