Loading...
BLD2015007_RTC_ENG1.pdf City of EdmondsBLD20150007 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20150007February 13, 2015 Project Name/Address: 18300 Sunset Way Contact Person/Address, Fax or E-mail: RANDY.MUNSON@COMCAST.NET Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: SITE PLAN General 1)Per the Drainage Report completed with the Murata short plat, the allotted impervious area permitted for Lot 1 to discharge to the onsitestormwater management system is 3,378 sqft. The proposed amount is 4,657 sqft. a.Please submit a revised drainage report from theengineer of record thatallows for the additional impervious area to discharge to the onsite stormwater managementsystem. Please clearly show howmuch impervious area is allotted per lot, the existing impervious area not discharging to the onsite stormwater managementsystem,and state if there is additional area that may be used by any of the three lots. This information will need to be on the recording documents for the Murata Short Plat. b.Or, you will need to decrease the size of the impervious area such that the proposed area is consistent with theapproved drainage report. 2)Please note on the plans theportion of thedriveway located within the right-of-waymust be asphalt from theedge of road to the property line. 3)Please show all easements and reference the recording number for the plat. DATE E-MAILED2/13/2015PAGE (1) City of EdmondsBLD20150007 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments WATER 1)Clearly distinguish the portions of the water service line that was installed with the short plat and the portion proposed to be installed. 2)It appears that a fire sprinkler system is required for this property. Please verify that the meter installed is a 1”meter. a.Please show the back of the water meter located at the property line (where the water meter is within the right-of-way). b.Please label the water service line as 1 ½” and note the pipe material and tracer wire. 3)It appears from the plans that the water and sewer do not meet theCity standard of 10’separation between water and sewerlines. Please show that there is a minimum of 10’ separation from the sewer and water. SEWER 1)Please show a 6”sewer cleanout at the property line (where the cleanout is locatedin the right-of-way). 2)Clearly distinguish the portions of the sewer that was installed with the short plat and the portion proposed to be installed. 3)Show that there is a minimum of 10’ separation from the sewer and water. STORM 1)Clearly distinguish the portions of the stormthat was installed with the short plat and the portions proposed to be installed. 2)Please show the connection of the roof drains to the stormwater managementsystem. 3)Please show the connection of the footing drains to the stormwater system. 4)Please show how the runoff from the driveway will be collected and discharged to the onsite stormwater management system. a)If a catch basin is to be installed, provide rim and invert elevations for all pipesinthecatch basin. DATE E-MAILED2/13/2015PAGE (2) City of EdmondsBLD20150007 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments DRY UTILITIES 1)Please add a note that all utilities must be underground. 2)Please show all the utilities to the house (i.e. power, phone,cable, etc.). There must be a minimum of 3’ separation from thedry utilities and water, sewer, storm. 3)It appears that a utility vault/pedestalis being placed over the storm system.Please relocatethe vault/ped, such that there is a minimum of 3’separation from water, sewer, and storm. TESC 1)Please provide an Erosion andGradingPlan. 2)Please add grading calculations. 3)Please show the construction entranceand referenceEdmonds Standard Detail E1.2. 4)Please add a note to the plans that filter socks will be added to any catch basins downstream from the construction site per Edmonds Standard Detail E1.3. 5)Pleaseshow andreference the Edmonds Standard Detail E1.1 for the installation of the silt fence. Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@ci.edmonds.wa.usif you have specific questions regarding these plan corrections. DATE E-MAILED2/13/2015PAGE (3)