Loading...
BLd20150294 150 Sunset Ave S, Top Pot.pdfMay 17, 2017 CITY OF EDMONDS DEPARTMENT OF FIRE PREVENTION MEMORANDUM To: Nick Echelbarger Email: Nick@ech-cpm.com From: Kevin Zweber, Fire Marshal Re: Plan Check: Bld2015-0294 Address: 150 Sunset Ave S, Edmonds, WA 98020 Project: Salish Crossing -Top Pot Scope: New Commercial building. During review of the plans for the above project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, please cloud the changes or additions. It is preferred that only the affected plan sheets be resubmitted: 1. Your proposed revision requires the addition of an automatic fire sprinkler and automatic fire alarm. International Fire Code (2015) Section 903.2.1.2 Group A-2. An automatic sprinkler system shall be provided for fire areas containing Group A-2 occupancies and intervening floors of the building where one of the following conditions exist: 1. The fire area exceeds 5,000 square feet. 2. The fire area has an occupant load of 100 or more. 3. The fire area is located on a floor other than a level of exit discharge serving such occupancies. Your resub/revision has an occupant load greater than 100 and has a fire area that is located on a floor other then a level of exit discharge. 2. Please call out on the plans: Deferred submittals: Automatic Sprinkler Permit, Fire Connection Permit and Fire alarm permit. Thanks, Kevin Zweber Deputy Chief — Fire Marshal City of Edmonds, Department of Fire Prevention