Loading...
bld20150322_kidd-2.docx City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections nd Plan Check : Date: # BLD20150322 2 Review June 15, 2015 Project Name/Address: Kidd New Single Family Residence 932 Olympic Way Contact Person/Address/Fax: Danielle Kidd stevek@multiaxis.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and Public Works| Engineering under Departments: This submittal was not complete. The comments provided were clear and there are handouts and examples provided for all required information on our website. There is a gis map on our website that provides locations, inverts and other information for all utilities. Please use these tools to provide a complete plan. The City is processing 4 times as many permits as they have in almost tens years, we are extremely short staffed. Please use the available resources to provide a complete plan to avoid further delays to plan approval. General: 1. 6/15/15 The water, sewer, and storm information is incomplete. Though it is not required to have a plan designed by an engineer for a Category 1 Small Site, it would be very helpful to provide a separate plan that includes the utilities including water, sewer and the stormwater system. The tesc information can be shown there as well. The site plan should show the end result of the construction; no construction entrance, etc. I am separating the type of comments out for clarity. Sheet A101: Site Plan: 1. 6/15/15 Provide one plan. Missing information as itemized below. If you choose to provide a separate utility plan, the site plan shall show the location of all the proposed utilities and stormwater system but does not need to include the details (length, size, etc.). The locations must be consistent with the civils. 2. 6/15/15 Not done. Also noted 15% maximum slope-14% slope is maximum limit per code- revise plan. Please call out width of driveway at property line (current dimension does not DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 13 match up with the actual driveway entrance). Please note that if the proposed garage will be two-car then the required width for the driveway at the property line is 24’. 3. Done. 4. 6/15/15 Not done The approach shall be constructed to the edge of the existing access road. Please show on plans. 5. Done. 6. Done.. Stormwater/Utility Plan: 1. Done. 2. 6/15/15 Not Done. Only a manhole #5 with a reference to the detention sizing is provided. Show the entire system on the plans. Provide inverts for both manholes required by the handout design. The #5 reference states a 36” pipe with a 17” inside diameter?? It should be 17’ in length and all shown on the plan. See the detail in the handout. All the information needed is provided clearly in the handout. There is no stormwater mitigation shown on this plan. Please review Handout E#72 for options. I am including with these comments the only piece I have left from your previous application that shows how the system was approved. A detention system would need to be sized differently as this plan has more impervious surface. I have attached the sizing sheet for your reference. The green (tightlines) and orange (footing drains) lines were the final configuration. 3. Please show how the roof drainage tightlines will be connected to the detention system. 4. Storm line connecting catch basin located to the south of the property line and the manhole to the west on the access road does not exist. Please show in dark pen weight to indicate it will be constructed with the project. 5. 6/15/15 Incomplete. All Rim and invert elevations shall be provided for all connections to verify slopes. This includes connections at catch basins, manholes, drywells, etc. The manhole shown on site has two (now 4) connections but only provides one invert and no rim elevation for example. Meaning provide rim and inverts for all structures. 6. 6/15/15 Incomplete. No Rockeries or walls shown. How will grade be held away from the back of the house? Show and add information as follows. Please show how and where drainage will be collected and conveyed from rockeries? It should be connected to the footing drain lines, not the tightline, per the geotech report. 7. Done. 8. Done. 9. 6/15/15 Not Done. Water service line and meter are not shown, call out length, size and material. Also, show water main (call out size and material) in road and show proposed connection. Call out size of proposed meter. If fire sprinkling is required the meter will need to be 1”. Call out size of water service line. 10. Show 4” or 6”side sewer clean out at house connection and 6” clean out at property line. 11. Clean out at property line is required to have a 12” locking cast iron lamphole cover with ½” hexbolts. Please note on plans. 12. 6/15/15 Incomplete. Sewer main not shown, lateral not shown. Please add the length and size (6”) of the sewer lateral (from 6” clean out at the property line to the connection at the main). Provide approximate invert of sewer connection at main. 13. Done. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 23 Grading: 1. 6/15/15 Not Done. Show the proposed final grades. Please include grade changes for wall and house etc. 2. 6/15/15 Not Done. This information is required on this plan sheet. Note bottom of footing elevation for proposed residence. 3. 6/15/15 Not Done. If there is not going to be a separate grading and tesc plan, please add a tesc notes section addressing all measures to be taken and referencing the geotech instructions for wet weather construction etc. Done. 4. New Comments per second submittal: CB-1 shows the 8” connection to SE is ductile iron, change to concrete, 6” connection is shown as pvc, change to ductile iron. Extrapolate connections of storm, water and sewer to mains in road. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 33