Loading...
BLD2015-0349 PO Sprinkler.pdfEagle Eye Consulting Engineers, PS West Coast Code Consultants Company PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 206-356-7790 To: Leif Bjorback Building Official City of Edmonds Woodinville WA 98072 Re: Edmonds Post Office Fire Sprinkler Submittal 130 Second Avenue N Edmonds, WA 98020 Edmonds Permit #: BLD2015-0349 EECE#: EDM 15-01 i n� t EAGLE EYE A West Coast Code C.—h—ts Company Wednesday, March 26, 2015 The above referenced project is in the process of plan review for compliance with City of Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plan review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. A response to correction must be provided to the city within 90 days of the date of this letter or the permit application may be cancelled without notice. SCOPE OF REVIEW The scope of this review is for the Fire Prevention requirements of this project. The project was reviewed for compliance with the State of Washington Building Codes. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. FIRE COMMENTS 1. Please clarify on the plans the locations and ratings of all fire -rated assemblies in accordance with Section 22.1.3 of NFPA 13 and note the fire stop systems that will be used at all penetrations in these assemblies per IBC 713. 2. Please note the "clearance" requirements for piping passing through walls and floors as required by Section 9.3.4 of NFPA 13. EECE Project #: EDM 15-01 Edmonds Permit #: BLD2015-0349 Page 2 of 3 3. The lateral sway bracing calculations assume that the post -installed anchors will be embedded into 6,000 psi concrete. Please confirm that this is the case. 4. Please clarify on the plans how restraint of branch lines will be provided as required by Section 9.3.6 of NFPA 13. 5. Hydraulic calculations for the Class I standpipe systems were not provided as required by Section 7.10.1.2.1 of NFPA 14. Please address. 6. Sheet FP 1: Please address the following... a. The 2013 edition of NFPA 13 is referenced while the State of Washington still enforces the 2010 version. The 2010 version of NFPA 14 should also be referenced. b. The "Hanger Detail" does not specify the diameter or required embedment of the Hilti KB TZ anchors. In addition, please note that the maximum spacing between hangers is 10 -feet per Section 9.1.3.5 (Item 3) of NFPA 13 rather than what is listed in Table 9.2.2.1. c. The "Wet & Dry Riser Assembly List" notes that a 625 gallon compressor capacity is required yet a calculation complying with Section 7.2.3 of NFPA 13 has not been provided. d. The "Riser Elevation" does not specify the kind and location of the alarm bell as required by Section 22.1.3 of NFPA 13, Item 26, nor has material data for the alarm been provided. 7. Sheet FP 2: The 2-1/2" mains will be attached directly to a Unistrut member anchored to the concrete parking garage walls. Please clarify how the Unistrut member will be attached to the wall and the maximum spacing of the pipe attachments to the Unistrut members. 8. Sheet FP 3: Please address the following... a. Sway bracing is not currently specified for the 2-1/2" mains at the garage as required by Section 9.3.5.3.1 of NFPA 13. b. Sway bracing is not currently specified at the 4" feeders which run along Grid F from the riser to the mains. 9. Sheets FP 4 — FP 6: There are several instances throughout the residential plans that it appears appropriate sprinkler coverage may not be provided. The following lists some examples. Please review the design and revise as necessary. a. There appear to be some locations (i.e. Unite N-2) where the Tyco LFII sidewall sprinklers are spaced more than 16 -feet apart while the material data provided notes a maximum spacing of 16 -feet. b. There are several areas where it appears that sidewall sprinklers will not provide adequate coverage as shown. Examples would include the bathroom in unit N-2 or the kitchen in unit M-2. EECE Project #: EDM 15-01 Edmonds Permit #: BLD2015-0349 Page 3 of 3 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans may also be reviewed concurrently by other departments within the City of Woodinville. Changes, clarifications or additional corrections may be required subsequent to the reviews performed by these other departments. Should you have any inquiries regarding this letter, please contact either Hoyt Jeter (ho3gkeece-wc3.com) or Chris Kimball (chrisk@,wc-3.com) via email or call our office at (206) 356-7790. By: (Y. .... .. Chris Kimball, PE, SE, CBO ICC Fire Plans Examiner ICC Fire Inspector I/II