Loading...
BLD20150362_CanAm_ENG1.pdf City of EdmondsBLD20150362 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425)771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20150362April 23, 2015 th Project Name/Address: Can-am Properties –23402–75Ave W Contact Person/Address, Fax or E-mail: High Definition Construction LLC –allencampbell52@gmail.com Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: GENERAL 1)Please add a note tothe plans that state the existing utilities will be removed and/or capped under the demolition permit(BLD20150250). 2)Please show the Utility Pole on the plans and show where the pole will be re-located. 3)Please label the 10’ Utility easement as private. th 4)Show the edge of pavement of 75Ave W on the plans. 5)Please show the driveway approach from the edge of roadway to the property line. 6)Label the proposed driveway material. Please note that the driveway from the edge of roadway to the property line must be asphalt. 7)Please remove the outline of the existing house. The existing driveway approach will need to be shown and labeland areas that are ‘To be removed’or ‘To remain’. 8)If changes made to the plan sheet create an unreadable document, the document can be separatedinto different plan sheets (Drainage/Utility Plan, Grading/Erosion Control Plan). EROSION CONTROL 1)Please showthe silt fence detail and referencethe Edmonds Standard Detail E1.1. 2)Please show theconstruction entranceand referencewith the Edmonds Standard DetailE1.2. DATE E-MAILED4/24/2015PAGE (1) City of EdmondsBLD20150362 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425)771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 3)Please add a note to the plans that filter socks will be added to any catch basins downstream from the construction site per Edmonds Standard Detail E1.3. WATER 1)Please show the back of the water meter located at the property line (where the water meter is within the right-of-way). a.If the water meter needs to be relocated, please show the existing and proposed location of the water meters. 2)Please label the pipe material, size, and note that tracer wirewill be installed. SEWER 1)Please show the sewer from the sewer main to the house. 2)Provide rim and invert elevations at the main and the house so that pipe slope and coverage can be verified. a.If the slope of the pipe exceeds 20% the pipe will need to be anchored. 3)Please label the pipe material and size. 4)It is unclear on the plans if the sewer shown is proposed. If the seweris existing and proposedto be re- used, please note that the sewer lateral(the portion of sewer from the main to the property line)must be 6”. a.If the lateral is not 6” you will be required to install a new connection at the main(romac inserta tee). Once on private property the side sewer may reduce to 4”. b.If the sewer lateral is 6”, the condition of theexisting sewer lateral must be inspectedby the City’s Public Works Dept. to determine if the lateral can be re-used. Contact Edmonds sewer division, 425-771-0235. If the sewer division finds the lateral inadequate, a new tap will be required. 5)Show a 6” cleanout at the property line(where the cleanout will be located within the right-of-way). Please add a note that the 6” cleanout at the property line will have a 12” cast iron lamphole cover with ½” hexbolts. DATE E-MAILED4/24/2015PAGE (2) City of EdmondsBLD20150362 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425)771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 6)Show a cleanout located within 2’ of the house, at any 90° bend, when there is less than 3’ between two 45° bends, and when there is more than 100’ between cleanouts. STORM 1)If you are considering infiltration of runoff, the soil testing completed by Western Geotechnical Consultants, Inc, (per the report dated 3/16/15) was not completed per Appendix C of the Edmonds Stormwater Code Supplement. Infiltration is preferred. a.Please submit a report completed per City Standards. b.At this time the City cannot complete the review until the infiltration rates are determined as outlined in the City Code (appendix C). c.Please note that raingardens/bioretention systems can be used with infiltration rates as low as 0.13 in/hr. 2)The proposed stormwater system is not a standard practice outlinedin the Stormwater Handouts. The system will need to be designed by a licensed engineer. If the proposed system is to be considered, please make sure that the following items are addressed by the engineer. a.Show the flow path for the splashblocks. b.Showwhich areas will discharge to the splashblocks and which will discharge to the level spreader (i.e.hatching, flow arrows, etc.). c.Show the connection of the downspouts to the level spreader. The downspouts must discharge to a catch basin prior todischargingto the level spreader. d.Clearly show that there is 25’ of vegetated path from the level spreaderon private property. It is th unclear where the edge of pavement for 75Pl W starts. 3)Show where the footing drains will discharge to. Typically, the footing drains do not discharge to the stormwater management system. a.If the footing drains will discharge to the onsite stormwater management system, please provide engineering calculations showing that the system is designed for them. b.Otherwise, please show the footing drains discharging to a separate system (i.e. drywell, etc.). 4)The surface water runoff from the driveway must discharge directly to the onsite stormwater management system. DATE E-MAILED4/24/2015PAGE (3) City of EdmondsBLD20150362 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425)771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments a.Please show the how the surface water runoff will discharge to the stormwater management system(i.e.directionalflow arrows). 5)Please provide rim and invert elevations for all pipes within any catch basins. DRY UTILITIES 1)Please remove any existing utilitiesif they are shown. 2)Please show all proposed dry utilities(gas, phone, cable, etc.)on the plans so thatminimum 3’utility separation can be verified. 3)Please show the utilitylinesrunning straight from the pole/mainsinto private property. Once on private property the line may angleas needed. 4)Please add a note that all utilities must be underground. Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED4/24/2015PAGE (4)