bld20150374_Mietzner-2.pdfZulauf, JoAnne From: Zulauf, JoAnne Sent: Monday, July 13, 2015 2:41 PM To: mikem@mietznergroup.com Subject: bId20150375 SFR 85th Place W Mike, I am reviewing the resubmittal for the Engineering Division. I just have one question. The impervious surface amounts differ between the civils and the drainage report. On sheet C1 under Project Data: Impervious 5424 sf Eff Impervious 4468 sf Pervious 957 sf Off site Asphalt 533 sf CSP Drainage Report: Impervious 5513 sf Eff Impervious 4557 sf Pervious 956 sf Off site Asphalt 622 sf Site Plan matches the Drainage Report Please make changes so all the numbers are consistent between the report and the two plans Resubmit corrected sheets. Thank you. .JoAnne Zulauf I Senior Engineeving Cechnician I na uuao aw¢a, "w q;,:w iva I Coy fl I dmicinds I I p `A. "",p P8 I IlkiA a iAa .s,, Vd r 98020 Joanne.Zula of@edmondswa.gov