Plan Review Corrections
Plan Check : Date:
# BLD20150461 April 22, 2015
th
Project Name/Address:
Edmonds School District Woodway Elem 9521 240 St SW
Contact Person/Address/Fax:
Corrie Rosen Mahlum crosen@mahlum.com
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.edmondswa.gov by choosing Permit Assistance:
Civil Sheets C100 and C101:
1. Please provide total existing impervious surface, and total new impervious surface.
2. Add note to plans to state that the portables are being placed on existing impervious
surface and will be temporary with the length of time estimated.
3. Please call out the five parking spaces along the access road.
4. Please provide width of the access road at each gate.
5. Add dimensions to the turn around on sheet C 101.
6. Add dimensions to the turn circle.
7. Identify the bus pick up/drop off area.
8. Call out the gas equipment and the power pole that cause the pinch point at the south gate.
9. Note signage that prohibits all traffic other than buses and staff to pass the gate noting if
existing or proposed.
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __
12
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __