Loading...
BLD20150604_Wurdeman_ENG1.pdf City of EdmondsBLD20150604 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20150604July 9, 2015 Project Name/Address: Wurdeman –707Main St Contact Person/Address, Fax or E-mail: Randy Munson –randy.munson@comcast.net Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessedat our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: SITE PLAN 1)As changes are being made to the plan sheets, please make sure all plans (i.e. Site Plan, Civils, Architecturals) are revised to be consistent with the changes. 2)Please show the retainingwall on these plans. SITE DEVELOPMENT PLAN (SHEET 1 OF 4) GENERAL 1)Please provide proposed final grade elevations for the driveway. This is to verify that theslope of the driveway does notexceed 14%. 2)Please show the location of the on-street parking. 3)Please provide a haul route(this comment is specific to this application due to the location of the site). 4)Please provide a traffic control plan (this comment is specific to this application due to the location of the site). SEWER No Comments. DATE E-MAILED7/9/2015PAGE (1) City of EdmondsBLD20150604 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments WATER 1)Pleaserevise the water meter and service line note tostate that the Cityof Edmonds will install the water serviceline(from the main to the meter), but the contractor willcomplete final restoration. STORM 1)CB 1 should say 4”IE 146.00 (In–E)not (Out-E). Please revise. 2)Please label which 4”line discharges to the drywell. 3)Provide invert elevations for the tightlineat the house to verify that if the emergency overflow pipe is neededthat the water discharges into the overflow pipe and does not backup in thetightlinepipe. 4)SDCO 2 should say 4”IE 146.57 (In –SE)not (Out –SE). Please revise accordingly. 5)Please showwhere the retaining wall drainage will discharge to. STORMWATER REPORT/CIVILS The following comments are provided from Jerry Shuster, Stormwater Engineer. Please contact Jerry directly at 425-771-0220 or by email at jerry.shuster@edmondswa.govwith any specific questions you may have regarding these comments. The geotechnical report shows three test pits, however, only one TP-1, is located on the subject 1) property.The drywell proposed for the northwest part of the subject property is not the same as the location of TP-1;therefore, it cannot be designed usingthe test pit information.Test pits or other subsurface characterizations must be performed in the location of the proposed drywell facilities.The applicant must follow the following procedures from the 2005 Ecology Volume II, Chapter 3.3.5 Site Characterization Criteria: Subsurface Characterization: Subsurface explorations (test holes or test pits) to a depth below the base of the infiltration facilityof at least 5 times the maximum design depth of ponded water proposed for the infiltration facility, Continuous sampling (representative samples from each soil type and/or unit within the infiltration receptor) to a depth below the base of the infiltration facility of 2.5 times the maximum design ponded water depth, butnot less than 6 feet. DATE E-MAILED7/9/2015PAGE (2) City of EdmondsBLD20150604 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Infiltration Rate Determination: Determine the representative infiltration rate of the unsaturated vadose zone based on infiltration tests and/or grain-size distribution/texture (see next section). As a minimum, one soil grain-size analysis per soil stratum in each test hole shall be performed within 2.5 times the maximum design water depth, but not less than 6 feet. The designer may consider moving the proposed north drywell further north, closer to the base of the hill 2) to potentially avoid the dry well destabilizing the slope. The pipe proposed from SDCO 2 to the SDCO 1 has a 51.48% slope.Pipes with slopes >20% require 3) some form of anchoring.Provide anchoring details. It is unclear whether the proposed pipe from SDCO 1 to the existing CB in the alley goes though or 4) under the proposed retaining wall.Please clarify.If the pipe goes through the wallor under the wall, please providea cross section detail. DRY UTILITIES 1)Please show all proposed dry utilities(gas, phone, cable, etc.)on the plans so that utility separation can be verified. GENERAL NOTES AND LEGEND(SHEET2OF 4) No Comments CLEARING, GRADING, & TESC PLAN(SHEET3OF 4) 1)Please show protection from compaction for theproposeddrywell locations. 2)Please show allneighboring structures and trees to the subjectsite. Thisis to verify that proper precautions are being taken to ensure no damageor approval of removal is obtainedforstructures or trees on sites adjacent to the construction. DATE E-MAILED7/9/2015PAGE (3) City of EdmondsBLD20150604 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments GENERAL DETAILS(SHEET4OF 4) No Comments Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@ci.edmonds.wa.usif you have specific questions regarding these plan corrections. DATE E-MAILED7/9/2015PAGE (4)