bld20150609_Demo.Addition.Remodel.pdf City of EdmondsBLD20150609 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov/ PUBLIC WORK DEPARTMENT Planning • Building • Engineering Plan Review Comments BLD20150609, 2015 PermitApplication:Date: #June25 th -Demo, Addition & Remodel22401 98Ave W Project Name/Address: Strayer tom @lerendesign.com Contact Person/Address, Fax or E-mail: Tom Leren Reviewer: Chris RiveraDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.gov/under City Government / Development Services Department / Engineering Division then scroll down to Handouts: 1)Please show thelocation of theside sewer line on thesite plan. 2)A right of way permitis required for the use of the right of way, attached is a right of way application. Please fill out and submit with a traffic control plan. 3) Per Edmonds Community Development Code 18.80.060C, where there is no curb or gutter,the driveway approach must be constructed with asphalt within the right of way up to the property line. Please identify the new driveway material within the right of way (asphalt) and on site (asphalt or concrete). 4)Please provide the date of construction forall existing impervious surfaces on the Site Plan. 5)With demolition of the garage,per the plans theconcrete slab will be removed. This takes the area down tobaresoils and will not be considered as Replacedexempt impervious surfaces.This will make the section of the new garage/addition New Impervioussurfaces, please make these corrections in the Impervious Surface Calculationstable. 6)In total, I’ve calculated Non-regulatedimpervious surfaces(existing surfaces to remain) as approximately 1,920sf and New (Post 1977) impervious surfaces at approximately 2,400sf. For whichall of the2,400sf ofimpervious surfaces will needto be mitigated by a stormwater management system, i.e. detention system or infiltration system. Please recalculate the impervious surface numbers and revise the Impervious Surface Calculations on your site plan. a)If an infiltration system is proposed,aDrainage Reportis required. Please submit aDrainage Report by a licensed Geotechnical Engineer.The report should addressthe soil conditions and infiltration rates. Refer to City handoutE-72B Low Impact Development BMP Simplified Sizingalso the Stormwater Code Supplement –Appendex CApproved Methods for Obtaining Design Infiltration Rates. DATE E-MAILED6/25/2015PAGE(1) City of EdmondsBLD20150609 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov/ PUBLIC WORK DEPARTMENT Planning • Building • Engineering Plan Review Comments b)If a stormwater detention system is proposed, please refer to handout E-72A, Stormwater Detention System Simplified Sizingfor stormwater management requirements. Please show the detention system on the site plan. c)Please revise the Drainage note within the site plan. The 2000sf referredto, is part of the 2,400sf of impervious surfaces that will need to be mitigated through an approved stormwater management system. Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1339or by e-mail at chris.rivera@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED6/25/2015PAGE(2)