Loading...
BLD20150641_O'Malley_ENG1.pdf City of EdmondsBLD20150641 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20150641July 14, 2015 Project Name/Address: O’Malley –754 Bell St Contact Person/Address, Fax or E-mail: Mike O’Malley –omalleybrothers@frontier.com Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: SITE PLAN GENERAL 1)Provide a separate ‘Grading and Erosion Control Plan’.The plan should be scaled at 1”=20’ 2)Provide a separate ‘Drainage and Utility Plan’. The plan should be scaled at 1”=20’ 3)As changes are made to other plan, please revise the Site Planas needed. 4)Either remove the Rockery Detail or add a note ‘not permitted by the City’. This is an old detail and the City does not regulate the construction of rockeries. 5)Sidewalks and curb/gutter are requiredper EdmondsCommunityDevelopment Code 18.90. Please show the sidewalk and curb/gutter on this plan. GRADING AND EROSION CONTROL PLAN 1)Show the appropriate temporary erosion control measures to be installed and note the appropriate City of Edmonds Standards details. 2)Please show protection from compaction for theproposedinfiltration location. DATE E-MAILED7/14/2015PAGE (1) City of EdmondsBLD20150641 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 3)Please show all neighboring structures and trees to the subject site. This is to verify that proper precautions are being taken to ensure no damage or approval of removal is obtained for structures or trees on sites adjacent to the construction. DRAINAGE& UTILITY PLAN GENERAL 1)Please show all the utilities on this plan (water, sewer, storm, gas, phone, power, etc.) 2)Sidewalks and curb/gutter are requiredper EdmondsCommunityDevelopment Code 18.90. Please show the sidewalk and curb/gutter and reference the appropriate City of Edmonds Details. WATER 1)Show the water main located in Bell St. 2)It appears that a fire sprinkler system is required for this property. a.Please show the water service line from the main line to the house. b.Show the water meter located such that the back of the meter is located at the property line. c.Please add a note that a 1” meter is to be installed. d.Please label the pipe material, size,and note tracer wireto be added. SEWER 1)Show the sewer main located in Bell St. 2)Please show the sewer from themain to the house. 3)Note if the sewer connectionat the main is existingor new. a.Ifthere is a sewer stub at the main, the connection will need to be inspected by the City’s Public Works department to determine if it can be reused. Contact Edmondssewer division, 425-771- 0235. DATE E-MAILED7/14/2015PAGE (2) City of EdmondsBLD20150641 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments b.Ifthe connection is new, a romac inserta tee is required and needs to be noted as such on the plans. 4)Please label the pipe material and size. The sewer lateral (from the main to the property line) must be 6”. Once on private property the sewer may reduce to 4”. 5)Show the6” cleanout at the property linesuch that the cleanout is located completely in the right-of- way. Please add a note that the 6” cleanout at the property line will have a 12” cast iron lamphole cover with ½” hexbolts. 6)Please note thatcleanouts must belocated within 2’ of the house, at any 90° bend, when there is less than 3’ between two 45° bends, and when there is more than 100’ between cleanouts. 7)Please show the invert elevations at the main and the house so that slope and coverage can be verified. If the slope of the pipe exceeds 20% the pipe will need to be anchored. STORM 1)The square footage of all improvements made within the City right-of-way(i.e. drivewayapproach, sidewalk, etc.)needs to beincluded in the impervious area calculations. The surface water runoff from these areas doesnot need to discharge to the onsite stormwater management system, but the system must be sized for the impervious area. Please revise the stormwater system as needed. 2)Show how the surface water runoff from the west drivewaywill be collected and discharged to the onsite stormwater management system. 3)All pipes must connect to a catch basin then discharge to the infiltration system. Please revise the plans accordingly. 4)Please provide rim and invert elevations for all pipes within the catch basins. 5)Showan observationwell in the infiltration system. 6)Show where the footing drains will discharge to. Typically the footing drains cannot discharge to the stormwater system unless the system is designed for them. DATE E-MAILED7/14/2015PAGE (3) City of EdmondsBLD20150641 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments DRY UTILITIES 1)Please show all proposed dry utilities(gas, phone, cable, etc.)on the plans so that utility separation can be verified. Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED7/14/2015PAGE (4)