Engineering Plan Review Comments
PermitApplication:Date:
#BLD20150681August 22, 2015
th
Project Name/Address:
Wardak –541-12Ave N
Contact Person/Address, Fax or E-mail:
Tom Leren –tom@lerendesign.com
Reviewer: JENNIFERLAMBERTDivision:
ENGINEERING
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.edmondswa.govunder City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
SITE PLAN
No Comments.
STORMWATER MANAGEMENT & UTILITY PLAN(C1)
GENERAL
1)Please add the following note to the plans, “The curb/gutterwill be replaced if it is damaged or does not
meet current City standards.”.
2)Sidewalks are requiredper Edmonds Community Development Code 18.90. Please show thesidewalk
on this plan.
3)Please note what kind of deck will be added and what will be below the deck. For example, spaced deck
with permeable surface below.
WATER
1)It appears that a fire sprinkler system is required for this property.
a.Please add a note that a 1” meter is to be installed.
b.The water service line shall be a minimum of1-1/2”. Please revise the plans accordingly.
DATE E-MAILED8/12/2015PAGE (1)
City of EdmondsBLD20150681
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221
Website: www.edmondswa.gov
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
c.If copper is not used, please note what pipe material will be used and that tracer wire will be
added.
2)Show the water meter located within the City right-of-wayoutside of the limits of the driveway.
SEWER
th
1)Note the size of the existing sewer main(8”Concrete)located within 12AveN.
2)Note the type of pipe materialproposed to be usedfor the sewer from the main to the house.
3)Please note the size of the side sewer and lateral.
a.The sewer lateral(the portion of sewer from the main to the property line)must be 6”.
b.Once on private property the side sewer may reduce to 4”.
4)Add a note to the plans that thenew connection at the mainwill be a romac inserta tee.
5)Show the 6”cleanout at the property line located within the City right-of-way.
STORM
1)Theproposed infiltration trench cannot be located within the City Easement. Please revise the plans
accordingly.
2)Per the Drainage Report, dated May 28, 2015, it does not appear that the proposed stormwater
management system was designed to collect for the footing drains.
a.Please show in the report thatincreasing the size of the infiltration by 27 cf will accommodatefor
both the runoff from the impervious surface area and the footing drains.
b.Orshow the footing drains discharging to a separate system.
3)All collected areas must discharge to a catch basin prior to the infiltrationsystem.Please revise the
plans accordingly.
4)Showthe overflow pathsfor the infiltration systems.
DATE E-MAILED8/12/2015PAGE (2)
City of EdmondsBLD20150681
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221
Website: www.edmondswa.gov
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
The following comments are provided from Jerry Shuster, Stormwater Engineer. Please contact Jerry
directly at 425-771-0220 or by email at jerry.shuster@edmondswa.govwith any specific questions you
may have regarding these comments.
Drainage Report –CSP Engineering, May 28,2015
1.The geotechnical report (Lui & Associates March 30,2015) identifies the Sample no. 1 (Test Pit 1) as
“Sand”.Volume III, section 3.3.6 of the Ecology 2005 Stormwater Management Manual for Western
Washington states that the USDA test procedure must be conducted in accordance with SOIL SURVEY
MANUAL, U.S. Department of Agriculture, October 1993.Chapter 3 of this document
(http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ref/?cid=nrcs142p2_054262) describes “Sand” as
“More than 85 percent sand, the percentage of silt plus 1.5 times the percentage of clay is less than 15.”
Sample No, 1 does not meet these criteria and should be classified as “Loamy Sand.”
Based on the “Loamy Sand” classification both samples should have a design infiltration rate of 0.5
inches per hour, based on Table 3.7 in the Ecology 2005 Stormwater Management Manual for Western
Washington.
Neither the sample from TP-1 or TP-4 are locatedbelow the proposed infiltration system. Per 2005
Ecology Volume III, Chapter 3.3.5 Site Characterization Criteria: Subsurface explorations (test holes or
test pits) to a depth below the base of the infiltration facility of at least 5 times the maximum design
depth of ponded water proposed for the infiltration facility.
2.At this time, the City has not adopted the Ecology 2012 Stormwater Management Manual for Western
Washington, geotechnical methodologies for determining design infiltration rates must comply with the
methodologies in the 2005 version.
3.Section 3.37, SSC-1 in the 2005 Stormwater Management Manual for Western Washington states that
infiltration facilities must be >=50 feet from slopes > 15%.The Lui andAssociates geotechnical report
recommends 30 feet from the top of a 40% slope.It does not appear that the location of the proposed
infiltration trench meets these criteria.Parallel trenches in the front yard (east of the garage) might be a
better location, provided that soil tests allow.
DRY UTILITIES
1)Please show all proposed dry utilities(gas, phone, cable, etc.)on the plans so that utility separation can
be verified.
DATE E-MAILED8/12/2015PAGE (3)
City of EdmondsBLD20150681
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221
Website: www.edmondswa.gov
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
DETAILS & NOTES(C2)
1)Revise note #6 from the Water Notes, to include theservice line from themain to the meter will be
installed by the City of Edmonds Public Works.
a.FYI…the contractor will be responsiblefor the final restoration of the any cuts made by the
public works department.
2)Remove note #11 from the Water Notes.
3)Revise note #8 under the Sanitary Sewer Notes to include testing of both the side sewer and sewer
lateral.
CONSTRUCTION SWPPP(C3)
1)Identify all tree drip lines that overlap the clearing limits including trees from adjacent properties.
Please resubmit 3 copies of the revised plansand associated documents with a written response to each
item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at
jennifer.lambert@edmondswa.govif you have specific questions regarding these plan corrections.
DATE E-MAILED8/12/2015PAGE (4)