Hi Rick,
I have finished review of the civil plans. All looks good, except a question did come up regarding
excavation and temporary shoring when the building plans examiner was wrapping up his review.
We noted the Terra Associates report dated January 29, 2007 indicates a couple different areas on
the site that would require temporary shoring. Can you please confirm that this is still applicable
with the current design and if so, can you please provide a plan sheet showing the location of the
temporary shoring?
I have also finished review of the cost estimate and have the following comments:
1.Please provide TESC bond quantity worksheets. These sheets seem to be missing from the
packet.
2.Move street light replacement to fall under ROW improvements.
3.Add water utility costs.
4.Add sewer utility costs.
5.Add erosion control measures related to bringing the water quality pond back into
compliance.
Thank you!
Jeanie
*¤ ¨¤ -¢#®¤«« - %¦¨¤¤±¨¦ 0±®¦± ¬ - ¦¤±
jeanie.mcconnell@edmondswa.gov
ΓΑΔȃΖΖΐȃΏΑΑΏǾ ¤·³ ΐΒΒΗ
7¤¡ - ¯Ȁ ¶¶¶ȁ¬ ¯²ȁ¤£¬®£²¶ ȁ¦®µ
0¤±¬¨³ #¤³¤± (®´±²Ȁ
-Ǿ 4Ǿ 4§Ǿ & ȟ ΗȀΏΏ ¬ ȟ ΓȀΒΏ¯¬
7¤£¤²£ ¸² ȟ8:30-noon