bld20150846-Building 10-no temp shoring confirmation.pdf From:Aidan Bird To:McConnell, Jeanie Cc:Johns, Kristin;Rick Tomkins;Brian Hansen Subject:FW: bld20150846 - Building 10 Date:Friday, May 13, 2016 10:14:07 AM Attachments:Point Edwards - Bldg 10 Geotechnical Review.pdf Jeanie, Please accept the below email as confirmation that there is no temp shoring on the job. Aidan Bird Project Architect Studio Meng Strazzara 2001 Western Avenue, Suite 200 Seattle, WA 98121-2114 tel 206.587.3797 | fax 206.587.0588 abird@studioms.com| www.studioms.com Member, USGBC Please consider the environment before printing this email. NOTICE: Studio Meng Strazzara, Inc. P.S. is providing, by agreement with certain parties, materials stored electronically. The parties recognize that data, plans, specification, reports, documents, or other information recorded on or transmitted as electronic media (including but not limited to “CAD documents”) are subject to undetectable alteration, either intentional or unintentional, due to, among other causes, transmission, media degradation, software error, or human alteration. Accordingly, all such documents are provided to the parties for informational purposes only and not as an end product nor as a record document. Any reliance thereon is deemed to be unreasonable and unenforceable. The signed and or stamped hard copies of the Architects Instruments of Service are the only true contract documents of record. From: John Sadler \[mailto:JSadler@terra-associates.com\] Sent: Friday, May 13, 2016 10:06 AM To: Aidan Bird Cc: Dealy Etter (detter@ventureseattle.com); Ted Schepper; Chris Davidson Subject: RE: bld20150846 - Building 10 Hi Aidan, The need for shoring in the southeastern corner of the building area was related only to the project design referenced in our 2007 report. The revised plan set we reviewed in 2013 showed the building excavation could be made using open cuts (see first paragraph of page 2 of the attached plan review letter dated October 29, 2013). I looked at the current plan set, which is nearly identical to the 2013 design, and it appears that there is room to complete the excavation using open cuts that are sloped at the inclinations recommended in our geotechnical reports. John C. Sadler, L.E.G., L.H.G. Project Manager|Engineering Geologist TERRA ASSOCIATES, INC . 12220 – 113th Avenue NE, Suite 130 Kirkland, Washington 98034 Office - 425-821-7777, Ext 107 Fax - 425-821-4334 Cell - 206-396-5792 jsadler@terra-associates.com … From: McConnell, Jeanie \[mailto:Jeanie.McConnell@edmondswa.gov\] Sent: Thursday, May 12, 2016 11:34 AM To: 'Rick Tomkins' Cc: Aidan Bird Subject: bld20150846 - Building 10 Hi Rick, I have finished review of the civil plans. All looks good, except a question did come up regarding excavation and temporary shoring when the building plans examiner was wrapping up his review. We noted the Terra Associates report dated January 29, 2007 indicates a couple different areas on the site that would require temporary shoring. Can you please confirm that this is still applicable with the current design and if so, can you please provide a plan sheet showing the location of the temporary shoring? I have also finished review of the cost estimate and have the following comments: 1.Please provide TESC bond quantity worksheets. These sheets seem to be missing from the packet. 2.Move street light replacement to fall under ROW improvements. 3.Add water utility costs. 4.Add sewer utility costs. 5.Add erosion control measures related to bringing the water quality pond back into compliance. Thank you! Jeanie *¤ ­¨¤ -¢#®­­¤«« - %­¦¨­¤¤±¨­¦ 0±®¦± ¬ - ­ ¦¤± jeanie.mcconnell@edmondswa.gov ΓΑΔȃΖΖΐȃΏΑΑΏǾ ¤·³ ΐΒΒΗ 7¤¡ - ¯Ȁ www.maps.edmondswa.gov 0¤±¬¨³ #¤­³¤± (®´±²Ȁ -Ǿ 4Ǿ 4§Ǿ & ȟ ΗȀΏΏ ¬ ȟ ΓȀΒΏ¯¬ 7¤£­¤²£ ¸² ȟ8:30-noon