bld20150846-Building 10-no temp shoring confirmation.pdf
From:Aidan Bird
To:McConnell, Jeanie
Cc:Johns, Kristin;Rick Tomkins;Brian Hansen
Subject:FW: bld20150846 - Building 10
Date:Friday, May 13, 2016 10:14:07 AM
Attachments:Point Edwards - Bldg 10 Geotechnical Review.pdf
Jeanie,
Please accept the below email as confirmation that there is no temp shoring on the job.
Aidan Bird
Project Architect
Studio Meng Strazzara
2001 Western Avenue, Suite 200 Seattle, WA 98121-2114
tel 206.587.3797 | fax 206.587.0588
abird@studioms.com| www.studioms.com
Member, USGBC
Please consider the environment before printing this email.
NOTICE: Studio Meng Strazzara, Inc. P.S. is providing, by agreement with certain parties, materials stored
electronically. The parties recognize that data, plans, specification, reports, documents, or other information
recorded on or transmitted as electronic media (including but not limited to “CAD documents”) are subject to
undetectable alteration, either intentional or unintentional, due to, among other causes, transmission, media
degradation, software error, or human alteration. Accordingly, all such documents are provided to the parties for
informational purposes only and not as an end product nor as a record document. Any reliance thereon is deemed
to be unreasonable and unenforceable. The signed and or stamped hard copies of the Architects Instruments of
Service are the only true contract documents of record.
From: John Sadler \[mailto:JSadler@terra-associates.com\]
Sent: Friday, May 13, 2016 10:06 AM
To: Aidan Bird
Cc: Dealy Etter (detter@ventureseattle.com); Ted Schepper; Chris Davidson
Subject: RE: bld20150846 - Building 10
Hi Aidan,
The need for shoring in the southeastern corner of the building area was related only to the
project design referenced in our 2007 report. The revised plan set we reviewed in 2013
showed the building excavation could be made using open cuts (see first paragraph of
page 2 of the attached plan review letter dated October 29, 2013). I looked at the current
plan set, which is nearly identical to the 2013 design, and it appears that there is room to
complete the excavation using open cuts that are sloped at the inclinations recommended
in our geotechnical reports.
John C. Sadler, L.E.G., L.H.G.
Project Manager|Engineering Geologist
TERRA ASSOCIATES, INC
.
12220 – 113th Avenue NE, Suite 130
Kirkland, Washington 98034
Office - 425-821-7777, Ext 107
Fax - 425-821-4334
Cell - 206-396-5792
jsadler@terra-associates.com
…
From: McConnell, Jeanie \[mailto:Jeanie.McConnell@edmondswa.gov\]
Sent: Thursday, May 12, 2016 11:34 AM
To: 'Rick Tomkins'
Cc: Aidan Bird
Subject: bld20150846 - Building 10
Hi Rick,
I have finished review of the civil plans. All looks good, except a question did come up regarding
excavation and temporary shoring when the building plans examiner was wrapping up his review.
We noted the Terra Associates report dated January 29, 2007 indicates a couple different areas on
the site that would require temporary shoring. Can you please confirm that this is still applicable
with the current design and if so, can you please provide a plan sheet showing the location of the
temporary shoring?
I have also finished review of the cost estimate and have the following comments:
1.Please provide TESC bond quantity worksheets. These sheets seem to be missing from the
packet.
2.Move street light replacement to fall under ROW improvements.
3.Add water utility costs.
4.Add sewer utility costs.
5.Add erosion control measures related to bringing the water quality pond back into
compliance.
Thank you!
Jeanie
*¤ ¨¤ -¢#®¤«« - %¦¨¤¤±¨¦ 0±®¦± ¬ - ¦¤±
jeanie.mcconnell@edmondswa.gov
ΓΑΔȃΖΖΐȃΏΑΑΏǾ ¤·³ ΐΒΒΗ
7¤¡ - ¯Ȁ www.maps.edmondswa.gov
0¤±¬¨³ #¤³¤± (®´±²Ȁ
-Ǿ 4Ǿ 4§Ǿ & ȟ ΗȀΏΏ ¬ ȟ ΓȀΒΏ¯¬
7¤£¤²£ ¸² ȟ8:30-noon