bld20150950_Ronquillo-2.docx
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
Engineering Division
Plan Review Corrections
Plan Check : Date:
# BLD20150950 December 31, 2015
Project Name/Address:
Ronquillo New Single Family 20621 Maplewood Dr.
Contact Person/Address/Fax:
Scott RonScott Construction scott@ronscotthomes.com
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.edmondswa.gov by choosing the “Services” tab and
“Permits/Development”.
General: 12/31/15 Not received yet.
1. Please sign and return the attached Low Impact Development Covenant. The covenant will
be recorded against the property. Current recording fees shall apply.
Sheet A1: Site Plan – 12/31/15 Revision have not been made to this plan.
2. Please see the attached site plan example and revise plan accordingly to match example.
3. Impervious surface calculations do not match the calculation table on Sheet C1. Please
revise as needed to be consistent.
4. Site plan does not need to show existing utilities (sewer, wm in driveway) or structures (ie
fences, garage, etc) to be removed, just the final configuration.
5. Show the 25 ft minimum dispersion flow area and show an outline of the trenches on the
plan. Add notes that state this is a protected area and shall remain natural vegetation. It
shall be consistent with the civil sheet C3.
Only show trees to be retained-see Civil Sheet C2- only one will be removed.
Remove all clouding.
Please double check that this plan is consistent with the civil sheets prior to resubmittal.
Sheet C1: Cover Sheet and Site Plan – 12/31/15 Approved
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.