bld20150951-Bloom-TI-E1.pdf
CITY OF EDMONDS
PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE:September 24, 2015
TO:Karen Nickle
Karen@bloomlearning.com
FROM:Bertrand Hauss, Transportation Engineer
Jeanie McConnell, Engineering Program Manager
RE:Application#:bld20150951
Project:Bloom Learning
Project Address: 1233 Olympic View Drive
During review of the independent traffic analysis prepared by Gibson Traffic Consultants and dated
September 2015, for the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please submit three (3) sets of revised plans/documents
with a written response to a Permit Coordinator.
1.The trip generation analysis establishes the proposed tenant space entirely as a Daycare
Center with a69% pass-by rate. While this might be appropriate for thedaycare center
component to thespace, a significant portion of thespace will be used as a trainingcenter, in
which the 69% pass-by does not seem to be applicable. Please revise the analysis toinclude
discussionon the training center aspect of theland use.
2.For the daycare center analysis,please clarify how the 69% bass-by rate that was used in the
other daycare center examples is applicable to this site.Do the daycare facilities have
similar models for the number of students, hours of operation, etc?
bld20150951-Bloom-TI-E1.docx Page 1of 1