Loading...
bld20150951-Bloom-TI-E1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:September 24, 2015 TO:Karen Nickle Karen@bloomlearning.com FROM:Bertrand Hauss, Transportation Engineer Jeanie McConnell, Engineering Program Manager RE:Application#:bld20150951 Project:Bloom Learning Project Address: 1233 Olympic View Drive During review of the independent traffic analysis prepared by Gibson Traffic Consultants and dated September 2015, for the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit three (3) sets of revised plans/documents with a written response to a Permit Coordinator. 1.The trip generation analysis establishes the proposed tenant space entirely as a Daycare Center with a69% pass-by rate. While this might be appropriate for thedaycare center component to thespace, a significant portion of thespace will be used as a trainingcenter, in which the 69% pass-by does not seem to be applicable. Please revise the analysis toinclude discussionon the training center aspect of theland use. 2.For the daycare center analysis,please clarify how the 69% bass-by rate that was used in the other daycare center examples is applicable to this site.Do the daycare facilities have similar models for the number of students, hours of operation, etc? bld20150951-Bloom-TI-E1.docx Page 1of 1