Loading...
bld20151001-Bergstrom-Add-E1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:September 22, 2015 TO:Brian Bergstrom brian@distinctiveglass.com FROM:Jeanie McConnell, Engineering Program Manager jeanie.mcconnell@edmondswa.gov RE:Application #: bld20151001 Project: Bergstrom Addition -replace wood deck, enclose carport to garage Project Address: 18401 High Street During review of the above noted application, it was found that the following information, corrections,or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. City of Edmonds handouts, standard details and development code can be referenced on the City website. 1)Please provide impervious surface calculations on the plans in the table format provided below. Also note on the plans the year of construction for all existing and proposed (under this permit) impervious surface areas. City records indicate an addition was done in 2002 and possibly a deck or patio in 1996. Stormwater management is required for impervious surface areas constructed on the site after 1997 that meet or exceed 2000sf. Please note, the square footages provided shall include the entire outline of the roof, walkways, patios, etc. Decks are not included in impervious surface calculations unless they are waterproof/have an impermeable membrane. With regards to the deck, please provide clarification on what the existing conditions were and what the final conditions will be. Was there previously a wood slotted deck over the top of an aggregate patio? If this is accurate, the deck would have beenconsideredpervious and the patio would have beenconsideredimpervious, however due to the removal down to bare soil and replacement with a new concrete slab, the area would beconsidered new impervious surface area. The impervious surface calculations should clearly reflect the existing and proposed conditions. IMPERVIOUS SURFACE CHART LineTypeArea (square feet) 1.Non-Regulated ExemptRegulated 2.Replaced 3.New (Post 1977)+ Total Regulated Impervious Area 4.= Mitigation required if in excess of 2000sf 5.Total Area Mitigated by Existing Stormwater Management System(s)- = 6.Regulated Area Not Yet Mitigated = 7.Area Proposed to be Mitigated by Low Impact Development Techniques = 8.Area Proposed to be Mitigated through Conventional SWM Techniques 2)Show location of existingandproposedutilities on the site plan, including water, sewer and storm. The following is a copy of the sewer asbuilt found in City files: Temporary erosion control measures are to be provided during construction. Indicate on the site 3) plan what measures will be provided during construction or if at this point construction is far enough along that the site has been fully restored, then pleaseindicate as suchon the plans. Page 2of 2