BLD20151168_Gelotte_ENG1.pdf City of EdmondsBLD20151168 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20151168November 13, 2015 rd Project Name/Address: Gelotte –22420–93Pl W Contact Person/Address, Fax or E-mail: Randy Newton -rknewt@msn.com Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: DEMO (BLD20151452) 1)Add a note that thewater and sewer will be cut andcapped per Olympic View Water and Sewer District. SITE PLAN 1)As changes are made to other plan sheets, please revise this sheet as needed. 2)Show the drip line of the trees. 3)The proposed infiltration system is shown closer to the trees than in the Drainage and Utility Plan. Revisethe planto be consistentamong the plan sheets. 4)If the sheds are to be removed, please label as such on the plans. SWPPP AND GRADING PLAN (1 OF 2) 1)Revise ‘BLDG2015____’ to ‘BLD20151168’. 2)Add a note that the filter socks will be added to catch basins downstream from the site per Edmonds Standard Detail E1.3 as needed. 3)The silt fence is shownaround the entire site; however, there appears to be no construction west of the infiltration system. Does the silt fence need to be located at the west property line. Please revise accordingly. DATE E-MAILED11/13/2015PAGE (1) City of EdmondsBLD20151168 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 4)Show all trees, both onsite and adjacent to the site,that are to remain. 5)Show the drip line of the trees. 6)Please show protection fencing at the drip line of the trees. 7)Please show the location of anystockpiles. The stockpilesshall not be placed overtheproposed location of theinfiltration system. 8)Protect proposed infiltration area from compaction by heavy machinery. DRAINAGE AND UTILITY PLAN (2 OF 2) GENERAL 1)Revise ‘BLDG2015____’ to ‘BLD20151168’. 2)Show the drip line of the trees. If thegravel area (located in the right-of-way) is located within the drip line, the gravel area will need to be removed and replaced with landscape to protect the tree. 3)There is a concrete curb and wood retaining wall on the Site Plan. Please show the curb and wall on the drainageand utility plan. Note as existing or proposed. WATER 1)It appears that a fire sprinkler system is required for this property. Typically if there is an existing water service line from the watermain to the meter the water service line/meter will not be the appropriate size and a new tap will be required. a.Please add a note thata1” meter is to be installed b.Show thewatermeter located in the right-of-way, such that the back of the meter is on the property line. c.Show the water meter; such that it is not located within the driveway. d.Please show a 1-1/2” line to be installed from the back of the meter to the house (as required for a combination fire and domestic service line). e.Please label the pipe material andnotetracer wireto be installed on the water service line. DATE E-MAILED11/13/2015PAGE (2) City of EdmondsBLD20151168 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 2)Show that there is a minimum of 10’ of separation between the water and the sewer lines. 3)Show that there is a minimum of 3’ of separation between the water and the dry utilities (i.e. power, phone, gas, cable, etc.). SEWER 1)Show the sewer line on the plansfrom the main to the house.This is to verify utility separation. 2)Please add anoteto the plansthatthe sewer shall be installed per Olympic View Water Sewer District’s requirements. Please note that a cast iron lamphole coveris required per Olympic View Water and Sewer District requirements. 3)Please remove the utility notes. The sewer is located within Olympic View Water and Sewer District; therefore, the sewer willneedto be installed per their requirements. STORM 1)The review of the storm system cannot be completed at this time. Please seem the comments below from Jerry Shuster. 2)The proposed infiltration system is shown farther from the trees than in the Site Plan. Revise theplans to be consistent among the plan sheets. 3)Show the infiltration systemor dispersion trenchno closer to the tree than the drip line. 4)Show how the surface water runoff from the driveway discharges to the onsite stormwatermanagement system (i.e. directional flow arrows). 5)Show the roof drains from the house to the catch basin (not stopping short). Provide invert elevations at the house so that slope and cover of pipe can be verified. 6)Please provide rim and invert elevations for all catch basins and all pipes. DATE E-MAILED11/13/2015PAGE (3) City of EdmondsBLD20151168 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 7)Show where the footing drains will discharge to. If the footing drains are to discharge to the onsite stormwater management system, please address the allowance for the footing drains in the design calculations. Comments by the City Stormwater Engineer Program Manager, Jerry Shuster, PE 1) The stormwater management system cannot be reviewed at this time due to an incomplete submittal. a) Please provide the infiltrations rates determined as outlined in Appendix C of the stormwater supplement (may use handout #E72D for reference). b) Provide the design calculations for the infiltration trench of the proposed stormwater management system. c) Oryou may propose a dispersion trench.It appears that the length ofyard from the trench to the property line may allow for this method. It will need to be demonstrated that there will be no significant adverse impactsto the downhill properties or drainage systems.See Volume V, Section 4.5.3 and Figures 4.9 and 7.10of the 2005 Ecology Stormwater Management Manual for Western Washingtonfor requirements of the dispersion trench.If a dispersion trench is to be installed, the infiltration rate does not need to be obtained, but aletter report outlining the design of the dispersion trench and a cross section of the trench needs to be submitted by a licensed engineer. DRY UTILITIES 1)Please show all proposed dry utilities(gas, phone, cable, etc.)on the plans so that utility separation can be verified. Minimum of 3’ horizontal separation between the dry utilities and water, sewer, storm. DATE E-MAILED11/13/2015PAGE (4) City of EdmondsBLD20151168 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED11/13/2015PAGE (5)