Loading...
BLD20151238_Hendrickson_ENG1.pdf City of EdmondsBLD20151238 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20151238November 30, 2015 nd Project Name/Address: Hendrickson –410–2Ave N Contact Person/Address, Fax or E-mail: James Croft –james@stillwaterdwellings.com Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: A1.00B –SITE PLAN 1)Thewater service lineshows connection to a catch basin and not the water meter. Please revise the plans accordingly. 2)Thecatchbasins shown on the plans is not consistent with thecivils. Please revise to show the entire system. 3)The sewer is not shown on this plan sheet. Please show the sewer. 4)The location of the trench drain is not consistent with the civils. Please revise accordingly. Please note that the trench drain must be located on private property. 5)Please clearly show the easement line on this plan sheet. ***Please show only the location of the utilities on thisplan sheet.*** C1.1 –COVER SHEET AND GENERAL NOTES 1)Please reference the building permit on the plans (BLD20151238) DATE E-MAILED11/30/2015PAGE (1) City of EdmondsBLD20151238 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments C2.1–TEMPORARY EROSION CONTROL PLAN nd 1)There are trees along 2Ave that are noted to remain. a.If these trees are to remain the silt fence should be located at the drip line of the tree to protect the tree roots. Please revise the plans accordingly. 2)If there aretreesfrom adjacentpropertieswhere the drip lineextends onto the subject site, please show the treesand their drip linesfrom the adjacent sites. 3)Please show protection fencing at the drip line of the trees. 4)Theexisting concrete driveway could be used as a construction entrance as long as no vehicles will drive off of the concrete area. Add a note/revise plans if needed. 5)Please add a note to the plans that state the existing utilities will be removed and/or capped under the demolition permit(BLD20151239). 6)Please show the grading and grading calculations on this plan sheet. 7)Show the proposedand existing topographic lines on this plan sheet. 8)Revise the title of this plan sheet to include grading. C3.1 -GRADING AND UTILITY PLAN GENERAL 1)Please remove thegrading from this plan sheet and put it on the C2.1. 2)Please remove grading from thetitle. 3)Add a note to the plans that if theexistingsidewalk is damaged and / or does not meet current ADA standards the sidewalkwill need to be replaced. WATER 1)Please add a note that themeter box is to be replaced and the meter is to be raised. DATE E-MAILED11/30/2015PAGE (2) City of EdmondsBLD20151238 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments SEWER 1)Per the plans thereappears to be trees planted over the City sewer main. Please provide a description of whattypes of treesare located on or near the sewer main. 2)The side sewer is shown to go through anexisting tree that is stated to remain. Is the tree to remain? If so, please show the sewer line located outside of the drip line of the tree. 3)It is unclearfrom theplans if the proposed side sewer is existingand proposed to be reused. If the sewer is proposed to be reused, the sewer will need to be inspected by the City’s Public Works department to determine if it can be reused. Contact Edmonds sewer division, 425-771-0235. a.If the sewer cannot be reused, anew connectionwill be required. The connection at the main will need to be a romac inserta teeinstalled by the contractor (not the City of Edmonds). 4)Please add a note that the cleanout locatedat the edge of easement is a 6” cleanout and will have a 12” cast iron lamphole cover with ½” hexbolts. 5)Show a cleanout located within 2’of the structure. STORM 1)The proposeddetention system is located within the drip line of the tree. If this treeis to remain, the detention system must be located outside of the drip line of the tree. Please revise the plans accordingly. The detention system can be locatedunder the driveway, but the system would have to have a minimum of 2’of cover. If the intention is to keep the detention system in the landscape area to meet the coverage and slope requirements, maybe angling the detention pipes or running the 23’pipe sections parallel with the drivewaywould achieve this. 2)Please show where the footing drains will discharge to. Please note that the footing drains cannot discharge into the detention system unless it is designed to collect for groundwater. Revise the plans accordingly. 3)Add a note to the plans that the roof drains located under the driveway must have a minimum of 2’of cover. DATE E-MAILED11/30/2015PAGE (3) City of EdmondsBLD20151238 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments A1.00A–EXISTING CONDITIONS AND DEMOLITION PLAN 1)Show the City sewer main. 2)Please show the existing sewer cut and capped at the edge of easement. 3)Add a note that the water will be cut and capped and an AVB valve will be installed. 4)Reference the Erosion controlplan(Sheet C2.1) for all temporary erosion controlmeasuresto be completed with the demolition of the house. Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED11/30/2015PAGE (4)