BLD20151312_South_Shore_Retreat_ENG3.pdf City of EdmondsBLD20151312 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20151312April 13, 2016 rd Project Name/Address: South Shore Retreat -541 3Ave N Contact Person/Address, Fax or E-mail: Jacob Strobl –Jacob@strobldesign.com Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can beaccessed at our website: www.edmondswa.govunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: 1st Review –12/21/15 nd 2Review –3/11/16 rd 3Review –4/13/16 SITE PLAN (A2) 1)As changes are made to other plan sheets, please revise this sheet as needed. 2)OK 3)OK 4)OK 5)OK 6)OK TESC PLAN (C01) No Comments DATE E-MAILED4/13/2016PAGE (1) City of EdmondsBLD20151312 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments DRAINAGE & UTILITY PLAN (C02) GENERAL 1)OK 2)OK 3)OK 4)OK 5)OK 6)OK WATER 1)OK 2)OK SEWER 1) OK STORM 1)OK 2)OK 3)OK 4)OK 5)OK DATE E-MAILED4/13/2016PAGE (2) City of EdmondsBLD20151312 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Stormwater review comments from Herrera below. 1)OK 2)OK 3)OK 4)OK 5)OK 6)OK 7)OK 8)OK 4/13/16 –Comment was addressed; however, t 9)he proposed pump design exceeds the flow rate of the 10-year storm for the site. Please revise pump system design to meet the flow control standard, or provide justification as to why it is “infeasible” to meet, as stated in in the Drainage Narrative. 3/11/16 Comment: The system curve crosses the pump curve at ~50gpm for the HW TDH, and ~45gpm for the LW TDH in Appendix E of the Drainage Narrative (1/25/16). This is above the 100-yr design flow of 40gpm. Please revise accordingly. 10)OK DRY UTILITIES 3)OK GRADING PLAN & DRIVEWAY PROFILE (C03) 1)OK DETAILS (C04) No Comment DETAILS (C05) DATE E-MAILED4/13/2016PAGE (3) City of EdmondsBLD20151312 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.edmondswa.gov PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 1)OK 2)OK 3)OK 4)4/13/16 –Commentwas partially addressed; however, based on the details provided, it does not appear that the pump system can be easily accessed or maintained. Per the City’s standard detail, E6.7, the lid removable and covers the entire diameter of the structure for this reason.Also the details do not show an antiflotation device. Please revise accordingly. 3/11/16 Comment: Please revise the pump station details to be consistent with the City’s stormwater pump policy and Standard detail E6.7 (Sewer grinder pump). For example, show antiflotation devices, rails, vent, etc. Make sure that the design shows that they system can be maintained (for example the standard detail E6.7 shows that the entire lid can be removed for a maintenance where a manhole lid does not allow for this. 5)OK New Comments –4/13/16–These two comments were added since the plan sheet needs to be revised; otherwise, these notes would have been redlined on the plans. 6)Shear gates are not permitted. Please remove from the detail and just show the piped capped. 7)The access riser is not needed. Please remove from the detail and Sheet C02. DETAILS (C06) No Comment Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED4/13/2016PAGE (4)