bld20151448_Campbell-Revision-2.docx City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20151448-Revision # 2 October 17, 2016 Project Name/Address: Campbell Garage 209 Caspers St Contact Person/Address/Fax: Rob Michel rwmichel@nwlink.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Services and then Permits/Development. This submittal is incomplete. Storm drainage conveyance and sizing cannot be reviewed. A full engineering review shall be provided upon receipt of a complete submittal. 1. 10/17/16 Not addressed. See Supplement. Stormwater Report and design over 5000sf is a Category 2 project. Please provide minimum requirements for a Small Site Category 2 project. Also see Stormwater Consultant Comments below. 2. 10/17/16 Not addressed. There is currently a road extending to the east from the driveway circle. Please show on plans and include in stormwater mitigation. 3. There is currently a rockery along the east property line. Show on plan. 4. 10/17/16 Addressed. 5. 10/17/16 Revision not correct. On the classification worksheet section, house and replaced patio are not included. House should be under existing at top etc…complete the full worksheet with corrections to impervious as noted in Stormwater comments below. 6. 10/17/16 Addressed 7. 10/17/16 Addressed 8. 10/17/16 Addressed 9. 10/17/16 Revision not correct. Add the notes back with either #4 excluded or removed so there is some information included since sheet 2 has been removed in revision. Please review section 5.6.2 of the Stormwater Supplement and revise note #4. 10. 10/17/16 Addressed 11. 10/17/16 Not addressed. Provide information for Yard Drain #2. Call out size of the catch basin and all invert elevations. 12. 10/17/16 Not fully addressed. 1-The driveway area west of the shop appears to drain into the cb as well as show sheet flow at the southwest corner. There is no indication of the actual area to be directed to sheet flow or of the size of the area to be designated for the flow path. The topos suggest that a large area of the drive may flow past the catch basin. 2- The flow path shown for the patio is not consistent with the Design Guidelines for a DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 13 vegetated flow path for sheet flow mitigation-See 2005 Stormwater Manual Volume V, page 5-11, bullet point #3. Please provide a list of each area of impervious surface and it’s square footage for clarity. 13. 10/17/16 Addressed 14. 10/17/16 Addressed. 15. 10/17/16 Addressed 16. 10/17/16 Addressed Yard Drain #2 has not been updated with rim and invert information. Provide rim and invert elevations for all four yard drains. Stormwater Report and Plan: Consultant Stormwater Engineer review comments. 1.8/5/16 Comment: The plans and report for the subject property dated November 5, 2015 proposed a total of 4,114 square feet of new plus replaced impervious surface, qualifying the project as a Category 1 Small Site Project. The plans and report for the subject property dated June 29, 2016 propose a total of 6,507 of new impervious surface, as well as a replaced impervious patio (unknown area), qualifying the project as a Category 2 Small Site Project. Please update the report to address the minimum requirements associated with a Category 2 Small Site Project, and quantify each new and replaced impervious surface area. 10/16/16 Comment: Comment was not addressed. The Bioretention Sizing Report (Report) and drawings dated September 20, 2016 show a total of 7,343 square feet (miscalculated as 6,758 square feet on Impervious Surface Routing Exhibit dated 9/2/2016 in the Report) of new plus replaced hard impervious surface area, qualifying this project as a Category 2 Small Site Project. Applicant shall directly address the applicable minimum requirements per Chapter 5 of the Exhibit A: Stormwater Code Supplement to Edmonds Community Development Code Chapter 18.30, and correct impervious surface area totals in the Report. 2.8/5/16 Comment: The proposed infiltration facility is 28” deep. City of Edmonds Handout #E72D states that for Category 2 small sites, borings and test pits shall extend 5 feet below the bottom of the facility. The soils report (Drainfield Designs, 6/16/16) includes descriptions of 3 soil logs indicating that explorations extended 48-65 inches below grade. Please submit soil data for soil at depths extending at least 5 feet below the infiltration facility, within the proposed footprint of the infiltration facility. Please define any acronyms included in the descriptions. 10/16/16 Comments: Comment was not addressed. 3.8/5/16 Comment: The soils report (Drainfield Designs, 6/16/16) includes descriptions of 3 soil logs with brief statements of soil classification. Please follow one of the approved methods for determining design infiltration rates listed in City of Edmonds Handout #E72D Requirements for Establishing Design Infiltration Rates (USDA Textural Classification or Modified PIT). 10/16/16 Comment: Comment was not addressed. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 23 Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 33