Plan Check : Date:
# BLD20151512 February 23, 2016
nd
Project Name/Address:
Sunrise of Lynnwood Parking Lot Improvements 21500 72 St SW
Contact Person/Address/Fax:
Rocky Mithun rockyf@mithun.com
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.edmondswa.gov by choosing the “Services” tab and
“Permits and Development”.
Sheet C0.1
1. On sheet C0.1, please change year of WSDOT APWA Standard Specifications to 2016.
Sheet C1.0
2. Add full TESC notes. Example attached.
3. Note 1 should refer to sheet C0.1. (this needs to be changed on all of the plan sheets)
4. Please show area of disturbance. This should include the area where the curb will be removed and
sawcutting will be performed.
Sheet C1.1
5. Please include in the area of disturbance the sidewalk area in the right of way that will be disturbed with the
connection of the new private sidewalk.
th
6. Please include in the area of disturbance the 2’ sawcut into 216 as required with the replacement of the
driveway entrance.
7. Construction fence shall not be installed in the right of way. Please revise.
Sheet C1.2
8. Add protection measures for the area where the infiltration trench will be installed.
Sheet C1.3
9. Add TESC details for all measures consistent with City of Edmonds Standard Details.
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __
12
Sheet C2.0
th
10. Show the location of sign indicating no exit on to 216. Add detail.
Sheet C2.1
11. Extruded curb is not permitted in the right of way. Please revise or call out standard curb as needed
th
between the property line and the sidewalk at the 216.
Sheet C2.3
12. Please add City of Edmonds Standard Details for the driveway entrance, the sidewalk panel, and asphalt
paving.
Sheet C4.0
13. Pipe connecting CB 5 and 12” existing appears to have a greater slope than described. Please recheck.
14. Please recheck connection of Area Drain #4 slope.
15. Add applicable MMR’s to plans. See Appendix A to Edmonds Community Development Code 18.30 –
Stormwater Supplement, available for reference on the city website (see above) under informational handouts.
Sheet C4.2
16. Please add City of Edmonds Standard Detail for the Control Structure #E5.4.
17. Please add a standard detail for the Area Drain #4 showing the depth of catch desired.
18. A Low Impact Drainage Covenant is required for the infiltration trench installation. Please find the
covenant form attached. The document must be recorded and returned prior to the final of construction.
Please find additional Stormwater Report Review comments attached provided by Herrera.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.