Loading...
BLD20151513-Grigg_ENG1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:December 30,2015 TO:Naomi Grigg Cadet_3@hotmail.com FROM:Jennifer Lambert Engineering Technician RE:Application #: BLD20151513& PLN20150062 Project: Grigg–Accessory Dwelling Unit st Project Address: 20129 81Ave W, Edmonds, WA During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning and Building, may result in additional comments. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinatoronce all divisions have completed their review. nd Resubmittals can be made atthe Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. City of Edmonds handouts, standard details and development code can be referenced on the City website. Please Note:Building Handouts do not include updated Engineering Division Requirements. Refer to Engineering Handouts for all Engineering Requirements. 1) Please labelthe property lines on the plans. 2) Please showthe access easement. 3) The plans must show that three parking stalls can be achieved on private property. The minimum width of the driveway shall be 17’ where two cars will be parked side by side. The minimum depth of the driveway shall be 16.5’. The entire parking area must be located on the subject site and not within the access easement. Please revise the plans to clearly show the locationof the driveway and that it meets the minimum City standards(i.e. dimensions, easementlocation, etc.). 11 Page of