Loading...
PR COMMENTS bld20160120_Lin-2.docx City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20160120-Comments #2 August 23, 2016 th Project Name/Address: Lin New Single Family Residence 24025 74 Ave W Contact Person/Address/Fax: Ted Clifton ted@zero-energyplans.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts, Standard Details, and GIS Map information referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Search and following Permits/Development: I have just made a bunch of mark ups on the plan to assist with getting this completed quickly. Please email me with any questions. General: 1. 8/23/16 Done. 2. 8/23/16 Done. 8/23/16 Not Done. A Covenant for the dispersion stormwater mitigation system is required 3. per Edmonds Community Development Code (ECDC) Section 18.30.80 B. The standard covenant form is attached as well as the Snohomish County Recording Document instructions. Please provide a completed covenant with exhibits A and B, signed and notarized by the property owner, to the City for review. Upon approval by engineering, the City Clerk’s office can record it for the property owner (subject to fees) or the applicant can take the document to Snohomish County and record it themselves and return a copy to the City. This does not need to be completed before approval and issuance of the plans but it is recommended since it requires an exhibit of the site plan. All information on the site plan must be clearly readable or the county won’t record it. It will help to only include information necessary to describe the dispersion trench and outline the dispersion area and dimensions of the lot and structure. A detailed plan is not preferred in this case. Sheet 14 – Stormwater Site Plan- “Stormwater/Utility Plan”: Please change title to 4. 8/23/16 Done 5. 8/23/16 Done 6. 8/23/16 Done DATE FAXED/E-MAILED 7/13/2017 PAGE ___ OF __ 12 7. 8/23/16 Done 8. 8/23/16 Done 9. 8/23/16 Done 10. 8/23/16 Done 11. 8/23/16 Done. 12. 8/23/16 Done 13. 8/23/16 Done 14. 8/23/16 Partially Done The Fire requirement is a 1” meter and a 1 ½” water service line. Also please show the location of the new meter farther north so the city crew will not have to disrupt the storm catch basin when installing the new line. Call out size of water meter and if existing or proposed. Call out material and length of pipe. 15. 8/23/16 Not Done Add water meter standard detail to plans. Driveway Sheet Flow Dispersion 16. 8/23/16 See notes on plans and on detail provided. Current configuration does not meet DOE requirements. Please review Sheet Flow Dispersion requirements in 2005 DOE Stormwater Manual and call out dimensions of the appropriate transition trench and show the sized dispersal area. 17. 8/23/16 Not Done. Add Sheet Flow Dispersion detail to plans. 18. 8/23/16 Done Roof Runoff Dispersion Trench 19. 8/23/16 See plan notes. Please see DOE Figure 5.1 – Typical Dispersion Trench. See Type 1 catch basin and trench configuration for collection of impervious areas over 700 sf. The catch basin cannot be located within the trench as the purpose is to “catch” any sediment or other deleterious materials before the runoff enters the trench. Revise plan. 20. 8/23/16 Done 21. 8/23/16 See plan notes. Are footing drains required for this project? If so, please show where they will discharge. Footing drains cannot be directed to the sized system. A 3x3x3 drywell is often chosen for this discharge. Sheet 15 Grading/Site Plan- 8/23/16 Done Sheet 15 Site Plan- revise existing plan 8/23/16 Done Sheet XX Grading/TESC Plan-new plan sheet ---- 8/23/16 Done Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/13/2017 PAGE ___ OF __ 22