Loading...
BLD20160129_CANOD.pdf[� Conditional Waiver. No critical area report is requirea ror sue plujcuL uw%,iiucu auvv%,. 1. There will be no alteration of a Critical Area or its required buffer. 2. The proposal is an allowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. ❑ ;Erosion fla ard. Project isvVilbin erosion hazard area. Applicant must prepare an erosion and sedirmont oonitol plan in cQinpiiance with ECDC 18.30. ritic rl ;area Report Required. The proposed project is within a critical 4rea atr+ l pr a critical are affer';and a critical area report is r•e uired. A Criticai area report has been trbrnitted'and evaluate 1. ✓ The proposal minimizes the impact on crincai areas in auu(AUdI1L,v w1L11 Lt Ll t J.�v.lf v, Mitigation sequencing; 2. The proposal does riot pose ars unreasonable threat to the public health, safety, or welfare On or, of `the development,proposer site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated.in accordance with ECDC 23.40.110, Mitigation requirements. 5. ✓ The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. ❑ Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately rhitigate its impact on critical areas an on doews unl comply with the criteria in ECDC 23.40.160 and the provisions of the City trfEdinonds critical area regulations. See attached findings of noncompliance. [�]favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the griteria in ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal.. Conditions. Critical Area specific condition(s) have been applied to the permit number referenced p specific condition(s). above. See referenced permit number for ec Y M evieer? Si tattrre . Date Appeals: Any decision to approves condition, or deny a develnprnent'proposal or other activity, rased on the requirements of critical area reg lations may be appealed according to, and as part of, the appeal procedure„ if any, for the permit or approval involved. Revised 12/1612010 / \ �4 1, y0l, 11—i m—ganda top rail with -- =~ replace wood ~...^~'_..�. Project 2: Repair exbxin&failed rockery: use better rock and construction keeping same footprint and height (3'-5). Project 3: Repair failing retaining waU:upQradehnm - railroad tie mcement block construction � keeping same footprint and height (2'~4'). ~-~ z� ��d� \N� cp A/ Zone, Comer Flag 'fat—"q�_ S�� ------- ----_-_ em ---�--- \J� ` Other --~---- ------- Q^""=,""A n~""."/"H,ns^n g�8�------------- 78,19 - -175mStreet SW Edmonds, WA 9OO�� - i75�8�e�tSVV ----- FEB ?N:3 � 8�� �JIU { COPY mmuurmm^��wu�s..� c07(DLIM