Loading...
bld20160240 - Boo Han Plaz-Parking-E1.pdf CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: April 1, 2016 TO: Joel Kessell Joelk.esl@gmail.com FROM: JeanieMcConnell, Engineering Program Manager jeanie.mcconnell@edmondswa.gov RE: Application #: bld20160240 Project: Boo Han Plaza –Parking Lot Drive Aisle Ramp Project Address: 22626 Highway 99 During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. 1.Provide top and bottom of rockery elevations. 2.It appears as though drive aislesand possibly parking adjacent to the rockery would actually place a surcharge on the rockery. Pleaseconfirm. If a surcharge exists then the rockery will need to be redesigned as a retaining wall and design calculations will need to be submitted to the City for review. 3.Utility surface features have been shown on the plans, but utilitylines/pipe locations have not been shown. Please revise to show utility lines/pipesin the vicinity of the proposed work. 4.Provide a cross section where utilities cross throughthe proposed cut(if any),clearly showing rockery/wall separation from the utilities and proper cover over utility systems. 5.Plans indicate relocation of thestairs, however the stairs are shown tying into the proposed rockery. This appears to be a conflict for pedestrianaccess. Please clarify the intent here. 6.Parking stall dimensions shall be added to the plans to confirm modified parking areas meet the City’s minimum requirement of 8 ½feet x 16 ½feet. 7.On the east side of the proposed rockery a 12-footclear dimension is provided. Please clarify what is the east of the clear area –building structure or patio? Will the 12-foot clear area provide access to the grease interceptor? 8.Please indicate drive aisle widths where thenew ramp connects with the northerly parking lot. Minimum 24-foot drive aisles shall be maintained. 9.Revise impervious surface area totals toinclude total impervious surfaceareafor thesite and year of construction. Impervious areas constructed after 1977 and exceeding2000sf will require stormwater mitigation. Page 2of 2