Loading...
bld20160320-Maplewood Center Pool-E1.pdf CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: April 1, 2016 TO: Vernon Enns Vern.enns@hargis.biz FROM: JeanieMcConnell, Engineering Program Manager jeanie.mcconnell@edmondswa.gov RE: Application #: bld20160320 Project: Maplewood Center Pool Mechanical th Project Address: 8500–200St SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. SHEET M2.1 –HVAC FLOOR PLAN & SECTION 1.Please revise plans to clearly show existingand proposed surfaces in the area of theproposed HRU-1. Is theexisting surface landscaping or impervious? If landscaping, will the new impervious area be limited tothenew 6”thick concrete pad?