bld20160320-Maplewood Center Pool-E1.pdf
CITY OF EDMONDS
CIVIL PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE:
April 1, 2016
TO:
Vernon Enns
Vern.enns@hargis.biz
FROM:
JeanieMcConnell, Engineering Program Manager
jeanie.mcconnell@edmondswa.gov
RE:
Application #: bld20160320
Project: Maplewood Center Pool Mechanical
th
Project Address: 8500–200St SW
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or
Fire may result in additional comments. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to a permit coordinator.
nd
Resubmittals can be made at the Development Services Department on the 2floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details and development code can be referenced on the City
website.
SHEET M2.1 –HVAC FLOOR PLAN & SECTION
1.Please revise plans to clearly show existingand proposed surfaces in the area of theproposed
HRU-1. Is theexisting surface landscaping or impervious? If landscaping, will the new
impervious area be limited tothenew 6”thick concrete pad?