BLD20160333-Westgate Elem-E1-5.11.2017.pdf
CITY OF EDMONDS
CIVIL PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE:
May 11, 2017
TO:
Nick Chou
choun@edmonds.wednet.edu
FROM:
Mitch Boyd,Stantec Consulting Services
Mitch.Boyd@edmondswa.gov
RE:
Application #: bld20160333
Project: WestgateElementary
th
Project Address: 9601 220St SW
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or
Fire may result in additional comments. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to a permit coordinator.
nd
Resubmittals can be made at the Development Services Department on the 2floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details and development code can be referenced on the City
website.
GENERAL
1.Include a City Engineering Division approval block on all plan sheets. Refer to sample on City
website.
Sheet G0.0–COVER SHEET
1.Include construction sequence. Refer to sample on City website.
Sheet C1.0–DEMO & TESCPLAN
1.Incorporate and reference City of Edmonds standard detail E1.1 for silt fencing.
2.Please show the location of the construction entranceand staging area. The construction
entrance is to be per City of Edmonds standard detail E1.2. Include the detail in the plans.
3.Incorporate and reference City of Edmonds standard detail E1.3. Replace existing catch basin
protection detail with E1.3.Install catch basin protection in any storm drains that are
downstream of the construction entrance.
4.Show stockpile location and indicate requirements to keep it covered.
5.Add note:Install and maintain all TESC measures according to approved plans, City of
Edmonds standard details, and all other measures that may be required during construction.
6.Please add a note to the plans that all disturbed soils will be compost amended perBMP T5.13.