Loading...
bld20160398 - QFC - sewer drain.pdf CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: April 15, 2016 TO: Brad –Williams Mechanical brad@williams-mechanical FROM: Jeanie McConnell, Engineering Program Manager jeanie.mcconnell@edmondswa.gov RE: Application #: bld20160398 Project: QFC –Trash Enclosure sewer drain th Project Address: 22828–100Ave W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. 1.Please revise plumbing plan to show property lines. 2.Indicate how the sewer line will be installed through/below the existing retaining wall. 3.The proposed sewer line shows a connection to the north of the compactor connection. Please confirm what the intent of this is. Roof water from the downspouts shall not drain to the sanitary sewer system. 4.Pursuant to a site visit and outlined in subsequent plan review commentsdated April 7, 2016by Les Krestel, Pretreatment Technician, it was noted that stormwater runoff currently flows into the compactor area. Stormwater runoff shall not enter the sanitarysewer system. Revise plans to show how stormwater and sanitary sewer discharges will be separated. 5.The side sewer asbuilt provided below was found on file with the City. What is shown on the asbuilt does not appear to match the plumbing plan that was submitted to the City. Please confirm and revise as needed. Page 2of 2