Loading...
bld20160545_Schroeder - Grading&Driveway #4.pdf City of EdmondsBLD20160545 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov/ PUBLIC WORK DEPARTMENT Planning • Building • Engineering Plan Review Comments PermitApplication:Date: #BLD20160545November 23, 2016 Project Name/Address: Schroeder -Grading& Driveway1142 Vista Pl. Contact Person/Address, Fax or E-mail: Steve SchroederSchroeder.steven@frontier.com Reviewer: Jeanie McConnell/Chris RiveraDivision: ENGINEERING During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. www.edmondswa.gov Comments 1 -June 30, 2016 Comments 2 -November 8, 2016 Comments 3 –November 23, 2016 1)ok 2)ok 3)ok 4)ok 5)ok 6)ok 7)6/30/2016 comment -Per city code, to be considered pervious surfaces the slope of the asphalt surface shall not exceed 5%.Per city handout E72B, the subgrade of the proposed paved driveway (a Category 2 Small Site Project see Handout E-72) shall not exceed 2% slope in order to meet 100% infiltration or shall not exceed 5% slope to meet 84% infiltration (the remaining 16% will need to be mitigated by another method). Subgrade beyond 5% slope does not meet city requirements and will be perceived as impervious. DATE E-MAILED11/23/2016PAGE(1) City of EdmondsBLD20160545 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov/ PUBLIC WORK DEPARTMENT Planning • Building • Engineering Plan Review Comments a.6/30/2016 comment -If the driveway cannot meet the minimum slope, storm water runoff will need to be collected from new impervious surfaces and directed to a new storm water management system or modified existing system. 1.6/30/2016 comment -If a new stormwater management system is added or the existing system is modified, provide design information on the storm management system and show the system on the site plan. Show the system, surface slopes, storm conveyance pipesand catch basin (and their invert elevations). November 8, 2016 comment –A new stormwatermanagement system has been proposed. Due to the flow path for the outfall, a geotechnical engineer will need to provide us with a stormwater drainage plan. Once received the proposal will need tobe reviewed by the city’s stormwater engineer. November 23, 2016 –Comment from Robert Edwards, City stormwater Engineer: In response to Item #7 in the Goldsmith letter dated November 15, 2016, for this project Keith J. Goldsmith’s qualifications are adequate to address the impacts of the outfall onto the steep slope. However, the following are required: 1.Provide a detail of outlet rock pad, including dimensions and rock size 2.The hydraflow calculations are for a 6-inchoutlet pipe. The plans depict an 8-inch outlet pipe. b.N/A 8)ok 9)November 8, 2016 comment –Consistent with Edmonds Community Development Code 18.80.060, driveway slopes shall not exceed 14% slope. Please indicate this requirement on the plans. November 23, 2016 –It was requested that a notebe placed on the plans that the slope shall not exceed the 14% slope so that in construction it is known that this slope cannot be exceeded. City staff can redline the plans. 10)November 8, 2016comment–An asphalt berm or asphalt thickened edge will need to be placed along the inner circle of the driveway in order to direct stormwater toward the stormwater management system. Please update the site plan showing the berm/thickened edge and revise the cross section. November 23, 2016 –Response letter states“As seen on Sheet 1, the cross slope of the proposed driveway is 2% towards the center. Therefore, a berm/thickened edge would be unnecessary as any stormwater would naturally flow towards the lowest point of the site at CB SD #2 connecting to the stormwater management system.” DATE E-MAILED11/23/2016PAGE(2) City of EdmondsBLD20160545 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov/ PUBLIC WORK DEPARTMENT Planning • Building • Engineering Plan Review Comments The cross section does indicate a 2% cross slope; however, the comment remains unaddressed. Without a berm or curb along the inside edge of the circular drive, the storm flows will runoff into the landscaping or pick up sediment from the landscaping and travel to the stormwater system. In order to properly manage the storm flows, a barrier shall be provided to direct storm flows to the stormwater detention system.Please revise plans accordingly. 11)November 8, 2016 comment –Elevations at the beginning of the driveway(section running east/west near existing paved road) appear to have slope such that stormwater will flow west or northwest. Please address the stormwater flows providing elevations on the site plan and section views that will show water flow to the stormwater management system. November 23, 2016 –Comment not addressed. Response letter addresses that portion of the driveway east of the existing driveway, but not the portion of the driveway running east/west where it meets the existing paved road. The stormwater flows from the new impervious surface areas shall be collected and directed to the stormwater detention system. The storm flows along the north side of the drivewayare directed toward the center of the loop (landscaped area) and no catchment system has been provided to collect these flows and connect to the stormwater detention system. Please revise plans accordingly. ok 12) ok 13) Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1339or by e-mail at chris.rivera@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED11/23/2016PAGE(3)