Loading...
bld20160598-Brackett Court-2.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.ci.edmonds.wa.us DATE:February 9, 2017 TO:Jake Lyon jake@prideventuresllc.com FROM:JoAnne Zulauf, Engineering Technician RE:Application#:BLD20160598 Project:Brackett Court–grading and utilities only th Project Address: 21276 80Ave W.,Edmonds Way The Engineering Division has reviewed the second submittal for the Brackett Court project. Please see the remaining items to be revised/completed prior to final approval. GENERAL 1.2/9/17 The submitted bond quantity is incomplete. Please add sewer and water improvements to the worksheet. Also please recheck calculations on all other items. The numbers are off, for example, there are 17 catch basins where the worksheet lists 12; between the footing drains, overflow piping and the tightline there isaround 1500 plus lf of pipe where the worksheet lists 500. Also just to ask, does all of that piping need to be 6” as stated on the plan? Please provide an accurate bond worksheet and update plans with changes, if any.Please provide an itemized engineers cost estimate, including units and unit prices,for both on-site and off-site (right-of-way) improvements, including traffic control.The City recommends use of the King County Site Improvement Bond Quantity Worksheet. A bond is required to be placed for all right-of-way improvements. The amount of the bond o will be based on 120% of the City approved estimate for all right-of-way improvements. The City will inform you of the appropriate bond amount after review of the cost estimate. Bond forms can beobtained from Kristin Johns, Permit Coordinator –425-771-0220 or Kristin.johns@edmondswa.gov. Inspection fees for this project will be calculated at 3.3% of the 120% City approved o estimate for all improvements. Storm Drainage Report: The following comments have been provided from the City’s stormwater consultant. 2-9-17See Stormwater Engineer comments attached. bld20160598-Brackett Court-2Page 1of 2 Civil Plan Review: Sheet C1–Cover Sheetand Existing Conditions-Done Sheet C2–Stormwater Pollution Prevention Plan-Done Sheet C3–Storm Drainage Plan 7.2/9/17 Outfall pipe and footing drain pipe is now called out as 6”. The approx. 100 lf of tightline has not been called out. Is 4” possible for some of this pipe? With the amount of pipe to be installed on this project, using 4” instead of 6” in areas, if the engineer design is possible, could save them several thousand dollars.Call out pipe size and material for all storm pipe shown on this plan sheet. Sheet C4–Sewer/Water Plan(Now Sheet C6)-Done Provide additional plan sheet: Sheet C5–Frontage/Striping/Access Plan -Done Sheet L-01–Landscape Plan 36. 2/9/17Not done.Please replace the pyrus calleryana, Bradford Pear with the designated street tree, pyrus calleryana “Glens Form” Chanticleer Pear. Trees may be spaced up to 30 – 35 ft on center if desired. 37. 2-9-17Not done. Revise caliper to 3” for the Chanticleer.Tree shall have minimum of 7’ branching height. 38.2-9-17 Not done.Add note(or add to note #14)to plans “A separate Irrigation permit is required. Contact the City of Edmonds Public Works Department at 425-771-0235 for more information.” Please contact me at 425-771-0220 or by e-mail at joanne.zulauf@edmondswa.govif you have specific questions regarding these plan corrections. Page 2of 2 Stormwater Review th File/Address:BLD20160598 / 21216 80Ave W Reviewer: Robert C. Edwards, PE, Stormwater Engineer, City of Edmonds Background This is classified as a Large Project because it involves 1 or more acres of land disturbing activity. Large Projectare subject to Small Site Minimum Requirements 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, and 11. Minimum Requirement #1 –Preparation of Stormwater Site Plan Comments: 1.Sheet C2, The CESCL is listed as Robert Edwards. This individual is the City of Edmonds’ Stormwater Engineer and cannot act as CESCL. 2.Sheet C4, remove “OR CRUSHED ROCK” from all infiltration trench details. Specify that the Clean Washed Gravelshall have a minimum void ratio of 0.33. 3.Sheet C4, Infiltration Trench #10 is specified as 4-feet deep, yet the WWHM modeling was performed at 5-feet depth. Please resolve. 4.Sheet C4, Infiltration Trench #11 is specified as 4-feet deep, yet the WWHM modeling was performed at 5-feet depth. Please resolve. Minimum Requirement #2 –Construction Stormwater Pollution Plan Comments:None Minimum Requirement #3 –Source Control of Pollution Comments:None Minimum Requirement #4 –Preservation of Natural Drainage Systems Comments: None -LID Minimum Requirement #5 –Onsite Stormwater Management Comments: None Minimum Requirement # 6 –Runoff Treatment Comments:None Minimum Requirement #7 –Flow Control Comments: 1.See MR#1 comments Minimum Requirement #8 –Wetland Protection Comments: N/A Minimum Requirement #9 –Operation and Maintenance Comments:None MinimumRequirement # 10 –Offsite Analysis and Mitigation Comments: None Minimum Requirement #11 –Financial Liability Comments:See Engineering Comment #1