bld20160672 - Peoples Bank - Sign2.pdf
CITY OF EDMONDS
PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE:June 23, 2016
TO:Dennis Titus
dennist@cgengineering.com
FROM:Jeanie McConnell
EngineeringProgram Manager
RE:Application #: bld20160672
Project: Peoples Bank -Sign
Project Address: 111 Main Street
During review of the above noted application, it was found that the following information, corrections, or
clarifications are needed. Reviews by other divisions, such as Planning and Building, may result in
additional comments. Please redline plans or submit three (3) sets of revised plans/documents with a
written response to each of the items below to a permit coordinator.
nd
Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit
Center hours are M, T, Th & F from 8am-4:30pm. The Permit Center is closed on Wednesdays.
City of Edmonds handouts, standard details and development code can be referenced on the City website.
Comments 1 –June 9, 2016
Comments 2 –June 23, 2016
June 23, 2016 –Thank you for providing a site plan.
1.
The plan indicates a new 7-foot sidewalk;however, a new sidewalkis not being proposed
a.
with this project –correct?
Dimensions have been placed on thephotos provided on the site plan and the dimension
b.
through the sidewalk is noted at 7-feet on an angle. The plan actually says 7-inches, but it
can be assumed 7-feet was the intent. Isthissupposed to be a measurement from theface
of thenew column to the curb?Please clarify the intent of this measurement.
bld20160672 -peoples bank -sign2.docx1
Page of
2
Please confirm the proposed column will be placedagainst the existingbrick column and
c.
fall to the north of the existing landscape area (and not in the sidewalk).With the notes
provided on thephotosit is now unclear where the column will sit in relation to the
sidewalk.
6/9/2016 comment -Provide a site plan that clearly shows the sidewalk, property line, column and
sign location.
2.ok
June 23, 2016–Thank you for providinga street use permit.
3.
The street use permit is required to locate a sign over the City sidewalk.The description
a.
of publicuse provided on the street use permit, however, indicates closure of sidewalk and
parking stalls. A right-of-way construction permit, which has already been submitted, is
required for theclosure of thesidewalkand parking stalls. Please revisethe street use
permit description of use to be consistent with placement of a sign overhanging the City
sidewalk.
The insurance certificatenotes Berry Sign Systems as theinsured. The business,People’s
b.
Bank, or the property owner, shall be the insured, not the sign company.
Please revise the Certificate Holder information on the insurance form to be consistent
c.
with the information provided in the City handout.The City of Edmonds Engineering
th
Divisionat121–5Ave N, Edmonds WA 98020shall be named as thecertificate holder.
6/9/2016 comment -A Street Use Permit is required to install a sign over the City sidewalk. While
blade signs are exempt from this requirement, a street use permit will still be required for the proposed
wall sign. Please refer to City of Edmonds Handout E75 –Street Use Permit Requirementsfor
additional information. Please read the handout thoroughly and submit all required information,
including a certificate of insurance including specific language and confirming required coverage
amounts.