DATE:June 2, 2016
TO:Craig Roosendaal
Roosendaal.craig@gmail.com
FROM:Jeanie McConnell, Engineering Program Manager
jeanie.mcconnell@edmondswa.gov
RE:Application #: bld20160679
Project: Roosendaal Retaining Wall
Project Address: 704 Bell Street
During review of the above noted application, it was found that the following information,
corrections,or clarifications are needed. Reviews by other divisions, such as Planning, Building, or
Fire may result in additional comments. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to a permit coordinator.
nd
Resubmittals can be made at the Development Services Department on the 2floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details and development code can be referenced on the City
website.
Comments 1 –May 27, 2016
Comments 2 –June 2, 2016
1.ok
June 2, 2016 –The drain line is shown to connect to the on-site stormwater detention
2.
system, however, this system is 1) not being reviewed and approved as part of this project,
and 2) appears to be designed perthe City’ssimplified sizingcharts which does not allow
for the introduction of groundwater into thesystem. Please revisethe wall drain discharge
point accordingly.Also, please update callout ofrockery draintoclearlystate wall drain
or retaining wall drain(as the rockery is being removed) and indicate pipe size and
material.
May 27, 2016 comment -The geotechnical technical memorandum prepared by Gary Flowers,
dated May 5, 2016, states a footing drainpipe will be required behind the wall. Please show the
drainage pipe on the site plan and indicate where the flows will be directed. Will a drywell be
installed on site?