Loading...
bld20160696_Kidd-2.docx City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20160696 Second Review August 30, 2016 Project Name/Address: Kidd New Single Family Residence 932 Olympic Ave Contact Person/Address/Fax: Steve and Danielle Kidd stevek@multiaxis.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and Public Works| Engineering under Departments: Please Note: Building Handouts do not include updated Engineering Division Requirements. Refer to Engineering Handouts for all Engineering Requirements. General Plan: 1. 8/30/16 Done.. 2. 8/30/16 Done. 3. 8/30/16 Done. 4. 8/30/16 Done. 5. 8/30/16 Done.. 8/30/16 Done. Sheet C1 Site, Grading, TESC Plan: 6. 8/30/16 Done. 7. 8/30/16 Done. 8. 8/30/16 Done. 9. 8/30/16 Done. 10. 8/30/16 Done. 11. 8/30/16 Done. 12. 8/30/16 Done. 13. 8/30/16 Not Done. Show required 2 ft asphalt sawcut along all areas of road where driveway will be installed. 14. 8/30/16 Done. 15. 8/30/16 Done. 16. 8/30/16 Not Done. It appears that rain rock is intended to be used for erosion control around the storm pipe and manhole. This rock will need to be removed to complete all construction. Please consider using straw or compost wattles to reduce site impact and to make it easier to remove.Call out or show erosion sediment control measures to be used in the location where manhole will replace existing catch basin. DATE FAXED/E-MAILED 7/1/2017 PAGE ___ OF __ 12 17. 8/30/16 Not Done. See #16. Call out or show erosion sediment control measures to be used along area where the storm pipe will be installed between the property to the new manhole. 18. 8/30/16 Done. 19. 8/30/16 Done. 20. 8/30/16 Not Done. Driveway is showing original elevations yet rim of catch basin is called out at 2 feet below the grade at that point. All areas to be regraded need to show the final grades. Show existing and proposed grade contours. 21. 8/30/16 Done. 22. 8/30/16 Done. Sheet C2 Stormwater Utility Plan: 23. 8/30/16 Done. 24. 8/30/16 Done. 25. 8/30/16 Partially Done. Add Standard Detail E5.4 and E5.3 to plans. Provide a detail showing the detention system that is proposed. You may use the detail included in the City of Edmonds handout E72A. Add to the detail all pipe sizes, rim and invert elevations, minimum distances required by code, orifice size, pipe length and any other information necessary to fully construct from the drawing. 26. 8/30/16 Not Done. Footing drains are shown connecting to the detention system manhole. Only the driveway runoff can be connected there. The footing drain conveyance must connect to the pipe after the detention system manhole. Between the manhole and the property line. Footing drains must connect to the private line on private property. Please revise location indicated on plans. 27. 8/30/16 Done. 28. 8/30/16 Done. 29. 8/30/16 Done. 30. 8/30/16 Done. 31. 8/30/16 Done. 32. 8/30/16 Done. 33. 8/30/16 Done. 8/30/16 New Comments: 1. Please remove the rain rock shown around the storm pipe and the manhole on this sheet. Pipe shall have standard bedding. 2. Add notes and show on plans the original swale beginning at the City’s rip rap drainage, the swale shalll be restored with compost amended soils and suitable grass mix. Pipe under the driveway may be necessary to continue the flow of the swale. Remove notation of rip rap to the northeast of driveway. Please resubmit 3 copies of the revised plans/documents with a response letter to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/1/2017 PAGE ___ OF __ 22