Loading...
BLD20160866 - Lu - E3.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:July 3, 2017 TO:Randy Munson Randy.Munson@comcast.net FROM:Mitch Boyd, Stantec Consulting Services Mitch.Boyd@edmondswa.gov RE:Application #: BLD20160866 Project: Lu-Single Family Residence Project Address: 8038 Cyrus Pl During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please submit two (2)sets of revised plans/documents including a written response to each item below. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.govunder Services/Permits and Development. GRADINGAND TESC PLAN 1)There are numerous conflicts between contoursand the tops and toes of retaining walls. Update grading around all retaining walls. 2)On the east side of the house, there is a callout for a toe of 131.0. This appears to be a local low point with no discharge location. Please install a yard drain and connect it to the proposed roof drain. Please provide rim and invert elevations, pipe material, and pipe size. Otherwise, regrade so it is no longer a local low point. 3)On the east side of the house, there is a callout for a toe of 136.0. This appears to be a local low point with no discharge location. Please install a yard drain and connect it to the proposed roof drain. Please provide rim and invert elevations, pipe material, and pipe size. Otherwise, regrade so it is no longer a local low point. 4)Please show the retaining wall footing drains on the east side of the house. STORMWATER AND UTILITY PLAN 1)Please update note 2 to a vertical clearance of 1.5 at water/sewer crossings. 2)Providea pipe anchordetail for both the sewer and the stormwater lines as they exceed 20% slope. 3)Please provide the footing drain invert elevations near the structure and at the discharge location. In addition, provide the footing drain pipe material and size. It is not clear on the plan where the footing drain discharges to. 4)The existing yard drain near the base of the driveway and the proposed yard drain 2 both have insufficient pipe cover. Please lower the invert elevations or use ductile iron pipe material. 5)Please provide the pipe material for the outflow pipe from CB#1. 6)Please provide a detail for the proposed retaining walls. STORMWATER REPORT The following comments are provided from Robert C. Edwards, PE, Stormwater Engineer. Please contact Robert directly at 425-771-0220 or by email at robert.edwards@edmondswa.govwith any specific questions you may have regarding these comments. Stormwater Review Background This is classified as a Category 1 Small Site Project because it creates/adds impervious area more than 2,000 SF and less than 5,000 SF. Category 1 Small Site Projects are subject to Small Site Minimum Requirements 1, 2, 3, 4, and 5. Minimum Requirement #1 –Preparation of Stormwater Site Plan Comments: 1.(Previous comment unaddressed)Sheet C2: Existing Yard Drain is shown with Rim Elevation 110.0 and I.E. 107.55. According to the FG contours on sheet 2, the Rim should be about 109.5. There is insufficient cover for the 8” discharge pipe. A possible solution is to specify Ductile Iron Pipe (DIP). 2.Sheet C2: YD#2 has insufficient cover. Minimum 12” cover in landscaped areas. 3.Sheet C3: Drawing scales at 1” = 20.35’, possible AutoCad paoperspace/modelspace scaling issue? 4.Sheet C3: Exist YD is specified at RE 110.0, yet shown at 109.60. IE of 6” is not shown. Insufficient cover, see comment 1. 5.Sheet C3: CB#1 and CB#2 are specified as 60-inch diameter. The profile scales these as 18-inch diameter. Minimum Requirement #2 –Construction Stormwater Pollution Plan Comments:None Minimum Requirement #3 –Source Control of Pollution Comments: N/A per SFR Minimum Requirement #4 –Preservation of Natural Drainage Systems Comments: None. Minimum Requirement #5 –Onsite Stormwater Management Comments: None Minimum Requirement #7 –Flow Control Comments: None Minimum Requirement #8 –Wetland Protection Comments: N/A Minimum Requirement #9 –Operation and Maintenance Comments: None Minimum Requirement #11 –Financial Liability Comments: N/A for SFR Page 2of 2