Loading...
BLD20161389- Tiersma Stormwater Review -1.docx Stormwater Review Date of Review: October 26, 2016 nd File/Address:BLD20161389, 22318 92 Ave W Reviewer: Robert C. Edwards, PE, Stormwater Engineer, City of Edmonds Background This is classified as a Category 2 Small Site Project because it is part of a two-lot short plat with impervious area exceeding 5,000 SF. Category 2 Small Site Projects are subject to Small Site Minimum Requirements 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, and 11. Minimum Requirement #1 – Preparation of Stormwater Site Plan Comments: 1. Cat 2 Small Site Projects that involve 5,000 SF or more of impervious area must be designed by a civil engineer. Please have the Stormwater plan stamped by a Professional Engineer, licensed in the State of Washington in Civil Engineering. Sheet A1 does not meet this requirement. 2. Please provide details, materials, sizes, and inverts of all Stormwater control features, including trenches, drywells, oil separators. 3. A CB is specified at the edge of driveway, yet no CB symbol is shown. 4. A circle is shown at the south end of the infiltration trench. It is not clear if this is a cleanout, overflow, or observation well. Minimum Requirement #2 – Construction Stormwater Pollution Plan Comments: None Minimum Requirement #3 – Source Control of Pollution Comments: 1. The Drainage Plan states “No extraordinary measures are required….with the project below the 5,000 square feet threshold.” The project is “part of a larger development” that is therefore to be designed as a Category 2 Small Site Project. Previously stated, the project exceeds the 5,000 SF threshold. Minimum Requirement #4 – Preservation of Natural Drainage Systems Comments: None, as infiltration is specified. Minimum Requirement #5 – Onsite Stormwater Management Comments: 1. See comments related to this section from Minimum Requirement #1. Minimum Requirement # 6 – Runoff Treatment Comments: 1. See comments related to this section from Minimum Requirement #1. Minimum Requirement #7 – Flow Control Comments: 1. LID techniques are specified for this project. Reiterating from previous comments, for Category 2 Small Site Projects, the LID techniques must be designed by a Professional Engineer licensed in the State of Washington in Civil Engineering. Minimum Requirement #8 – Wetland Protection Comments: None Minimum Requirement #9 – Operation and Maintenance Comments: 1. The site plan specifies two oil separators. Please provide O&M guidance for these structures with respect to their oil control function. Minimum Requirement # 10 – Offsite Analysis and Mitigation Comments: None, as LID is specified Minimum Requirement #11 – Financial Liability Comments: None