Loading...
BLD2016-1458 75% DEMO FORM.pdfPermit A d,' Address. V� Home Owner. r-6wk Contractor: This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost, the structure will be required to be rebuilt to the standards of new construction. Replacement cost of existing home 2 SV A O How was the value determined? ® CAAD 1 p op Component Percentage to Value of Condition Notes remain remaining component Foundation l®d V Floor Framing Zoo Floor Insulation IWO 6. Wall Framing Wall Insulation _ K Siding �— Roof Framing Attic Insulation Windows Doors f Plumbing Electrical HVAC !D Drywall .� V Cabinets Deck Other UZ5190 A�� Total Owner —?Z — Contractor.µ., Date r' l