BLD2016-1458 75% DEMO FORM.pdfPermit A
d,' Address. V�
Home Owner. r-6wk
Contractor:
This form may be used to help establish the percentage of demolition work performed to an existing
home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing
home's replacement cost, the structure will be required to be rebuilt to the standards of new
construction.
Replacement cost of existing home 2 SV A O
How was the value determined? ® CAAD 1 p
op
Component
Percentage to Value of
Condition
Notes
remain remaining
component
Foundation
l®d
V
Floor Framing
Zoo
Floor Insulation
IWO
6.
Wall Framing
Wall Insulation
_
K
Siding
�—
Roof Framing
Attic Insulation
Windows
Doors
f
Plumbing
Electrical
HVAC
!D
Drywall
.�
V
Cabinets
Deck
Other
UZ5190
A��
Total
Owner
—?Z —
Contractor.µ., Date r' l