Loading...
BLD20161499-ENG1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:February 3, 2017 TO:Kayla Clark Select Homes, Inc. Kayla.clark@outlook.com FROM:Jennifer Lambert, Engineering Technician Jennifer.lambert@edmondswa.gov RE:Application #: BLD20161499 Project:Select Homes-Single Family Residence th Project Address: 1137 6Ave S During review of the above noted application, it was found that the following information, corrections,or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please submit three (3) sets of revised plans/documents with a response letter addressingeach of the items below. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website; edmondswa.gov. GENERAL COMMENTS 1.Revise ‘BLD2016_____’to ‘BLD20161499’. SHEET 1 OF 4 –SITE DEVELOPMENT PLAN GENERAL 1. Please add anote that the final restoration for all utility connections andutility abandonments (sewer, water, and storm) is to be completed by the contractor.A field inspection is required to determine the final restoration limits. 2. Please show the asphalt cuts for final restoration for the new water service line installation and the cut and cap of theexisting water service line. 3. Please show a minimum of 3’-5’of separation between the driveway and the utility pole. 4. Please clearly state that landscape will be installedin the right-of-waybetween the property line and the edgeof asphalt.This area cannot be gravel, asphalt, etc. unless approved otherwise. WATER No comments. SEWER 1. If the existing side sewer is to be re-used, the line must be cut and capped a minimum of 20’ from existing and/or proposed foundation whichever foundationis closest to the sewer stub. Please revise the plans accordingly. 2. Please add a note that theside sewer will need to be TV’d and submitted to the City for review and approval to re-use. 3. Please add a note that the sewer lateral will need to be TV’d by the City of Edmonds, Sewer Department, to determine if the line can be re-used. If the line is damaged or not a 6”line from the main to the propertyline, the sewer lateral will need to be replaced. STORM STORMWATER REPORT The following comments are provided from Robert C. Edwards, PE, Stormwater Engineer. Please contact Robertdirectly at 425-771-0220 or by email at robert.edwards@edmondswa.govwith any specific questionsyou may have regarding these comments. Background This is classified as a Category 1Small Site Project because it creates/addsimpervious areamore than 2,000 SF andless than5,000 SF. Category 1Small Site Projects are subject to Small Site Minimum Requirements 1, 2, 3, 4, 5, 7, 8, 9, and 11. Minimum Requirement #1 –Preparation of Stormwater Site Plan Comments:In order to use simplified sizing, the following changes are needed: 1.Sheet SP-01 “INFILTRATION TRENCH” should read “DRYWELL” 2.Sheet SP-01 “@ CENTER OF TRENCH” should read “DRYWELL” 3.Sheet GN-01 Two instances of “INFILTRATION TRENCH” should read “DRYWELL” 4.Sheet GN-01 Add drywell material specification, “1-1/2” –3” Washed Drain Rock” Minimum Requirement #2 –Construction Stormwater Pollution Plan Comments:None Minimum Requirement #3 –Source Control of Pollution Page 2of 3 Comments:N/A per SFR Minimum Requirement #4 –Preservation of Natural Drainage Systems Comments: N/A per LID Minimum Requirement #5 –Onsite Stormwater Management Comments: See MR #1 comments above Minimum Requirement #7 –Flow Control Comments:Flow control by LID Minimum Requirement #8 –Wetland Protection Comments: N/A Minimum Requirement #9 –Operation and Maintenance Comments: 1.The Maintenance Requirements are missing. a.Consider Table 3.5of VolumeIIIofthe 2005 SWMM for Western Washington, page 3-56 for catch basins b.Consider maintenance criteria for infiltration trenches, page 3-103 of Volume III of the 2005 SWMM for Western Washington. Minimum Requirement #11 –Financial Liability Comments:N/A for SFR SHEET 2OF 4 –GENERAL NOTES AND DETAILS GENERALNOTES 1. Note 21 –Revise ‘linda.mcmurphy@...’to ‘jeff.kobylk@...’ SHEET 3OF 4 –CLEARING, GRADING, AND TESC PLAN 1. Show protectionfencing around the LID stormwater facilities. SHEET 2OF 4 –GENERAL NOTES AND DETAILS 1. Please add the silt fence detail to this sheet. Page 3of 3