CITY OF EDMONDS
CIVIL PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE:June 14, 2017
May 24, 2017
April 11, 2017
TO:
Kristin Hanson–Hanson Design
hansondesign@hotmail.com
FROM:
Mitch Boyd,Stantec Consulting Services
Mitch.Boyd@edmondswa.gov
RE:
Application #: bld20161710
th
Project: 7607 206St SW Duplex
th
Project Address: 7607 206St SW A&B
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or
Fire may result in additional comments. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to a permit coordinator.
nd
Resubmittals can be made at the Development Services Department on the 2floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details and development code can be referenced on the City
website.
GENERAL
1)SubmitROW Permit Applicationform.
2)Please submit a traffic control plan.
Sheet 1of 2–SITE PLAN AND DRAINAGE
1.Provide HMA overlay for the entire water service line. To reduce total sawcut, combine HMA
patchesas they are all near one another.
2.Presently, the gas service is shown connecting to the power pole. Gas services should never
connect to a powerpole. Please connect gas service to the gas main located on the north side of
the property.
3.Please label the water service pipe material and note tracer wire to be installed.
4.Pleaselabel the water service line to be1½”.
5.Please see the stormwater review from Robert Edwards. It has been determined that dispersion
is not feasible for the project, please mitigate stormwater with infiltration BMPs.
6.A Stormwater Covenant is required to be recorded against the property forproposed infiltration
stormwater facilities. Please complete the covenant, including notarization and any required
exhibits and submit to the city. The document must be complete, but will not be recorded prior
to permit issuance. Prior to construction final location of facilities are to be verified (by field
inspection and asbuilt) and then the covenant will be recorded.Please see the attached
document.
Sheet 2of 2–TESC, SWPPP, NOTES, & DETAILS
1.Thenoteregarding silt socks is cut off from the plan. Please relocate.
STORMWATER REPORT
The following comments are provided from Robert C. Edwards, PE, Stormwater Engineer. Please
contact Robert directly at 425-771-0220 or by email at robert.edwards@edmondswa.govwith any
specific questions you may have regarding these comments.
Stormwater Review
Date of Review: June 12, 2017
th
File/Address:BLD20161710 –7607 206St SW
Reviewer: Robert C. Edwards, PE, Stormwater Engineer, City of Edmonds
Background
This is classified as a Category 1Small Site Project because it creates/addsimpervious areamore
than 2,000 SF andless than5,000 SF.
Category 1Small Site Projects are subject to Small Site Minimum Requirements 1, 2, 3, 4, and 5.
Minimum Requirement #1 –Preparation of Stormwater Site Plan
Comments:
1.Show FG contours on sheet 1 for all grading and flow paths.
2.The flow pathsfrom the building are inadequate in length.
3.Adverse impact may occur to the property northof the subject property given the proximity
of the North property to the property line.
4.Infiltrative LID BMPs will require an adequate soils report with infiltration testing.
5.Update stormwater report.
Minimum Requirement #2 –Construction Stormwater Pollution Plan
Comments:None
Minimum Requirement #3 –Source Control of Pollution
Comments:N/A per SFR
Minimum Requirement #4 –Preservation of Natural Drainage Systems
Comments: N/A per LID
Minimum Requirement #5 –Onsite Stormwater Management
Comments: See MR#1
Minimum Requirement #7 –Flow Control
Comments:Flow control by LID
Minimum Requirement #8 –Wetland Protection
Comments: N/A
Minimum Requirement #9 –Operation and Maintenance
Comments:None
Minimum Requirement #11 –Financial Liability
Comments:N/A for SFR
Page 2of 2