Loading...
BLD20161710-Messenger-E3.pdf CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:June 14, 2017 May 24, 2017 April 11, 2017 TO: Kristin Hanson–Hanson Design hansondesign@hotmail.com FROM: Mitch Boyd,Stantec Consulting Services Mitch.Boyd@edmondswa.gov RE: Application #: bld20161710 th Project: 7607 206St SW Duplex th Project Address: 7607 206St SW A&B During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. GENERAL 1)SubmitROW Permit Applicationform. 2)Please submit a traffic control plan. Sheet 1of 2–SITE PLAN AND DRAINAGE 1.Provide HMA overlay for the entire water service line. To reduce total sawcut, combine HMA patchesas they are all near one another. 2.Presently, the gas service is shown connecting to the power pole. Gas services should never connect to a powerpole. Please connect gas service to the gas main located on the north side of the property. 3.Please label the water service pipe material and note tracer wire to be installed. 4.Pleaselabel the water service line to be1½”. 5.Please see the stormwater review from Robert Edwards. It has been determined that dispersion is not feasible for the project, please mitigate stormwater with infiltration BMPs. 6.A Stormwater Covenant is required to be recorded against the property forproposed infiltration stormwater facilities. Please complete the covenant, including notarization and any required exhibits and submit to the city. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction final location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded.Please see the attached document. Sheet 2of 2–TESC, SWPPP, NOTES, & DETAILS 1.Thenoteregarding silt socks is cut off from the plan. Please relocate. STORMWATER REPORT The following comments are provided from Robert C. Edwards, PE, Stormwater Engineer. Please contact Robert directly at 425-771-0220 or by email at robert.edwards@edmondswa.govwith any specific questions you may have regarding these comments. Stormwater Review Date of Review: June 12, 2017 th File/Address:BLD20161710 –7607 206St SW Reviewer: Robert C. Edwards, PE, Stormwater Engineer, City of Edmonds Background This is classified as a Category 1Small Site Project because it creates/addsimpervious areamore than 2,000 SF andless than5,000 SF. Category 1Small Site Projects are subject to Small Site Minimum Requirements 1, 2, 3, 4, and 5. Minimum Requirement #1 –Preparation of Stormwater Site Plan Comments: 1.Show FG contours on sheet 1 for all grading and flow paths. 2.The flow pathsfrom the building are inadequate in length. 3.Adverse impact may occur to the property northof the subject property given the proximity of the North property to the property line. 4.Infiltrative LID BMPs will require an adequate soils report with infiltration testing. 5.Update stormwater report. Minimum Requirement #2 –Construction Stormwater Pollution Plan Comments:None Minimum Requirement #3 –Source Control of Pollution Comments:N/A per SFR Minimum Requirement #4 –Preservation of Natural Drainage Systems Comments: N/A per LID Minimum Requirement #5 –Onsite Stormwater Management Comments: See MR#1 Minimum Requirement #7 –Flow Control Comments:Flow control by LID Minimum Requirement #8 –Wetland Protection Comments: N/A Minimum Requirement #9 –Operation and Maintenance Comments:None Minimum Requirement #11 –Financial Liability Comments:N/A for SFR Page 2of 2