Loading...
BLD20161719-Lanning SFR-Eng&Demo1.pdf CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE:May 4, 2017 TO:Mike and Chrystal Lanning Mlanning6@comcast.net FROM:Mitch Boyd, Stantec Consulting Services Mitch.Boyd@edmondswa.gov RE:Application #: BLD20171719/20 Project: Lanning-Single Family Residence/Demo Project Address: 396Sunset Ave N During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please submit two (2)sets of revised plans/documents including a written response to each item below. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pmand on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.govunder Services/Permits and Development. GENERAL 1)SubmitROW Permit Applicationform 2)Submit Side Sewer Permit Applicationform 3)Include a City Engineering Division approval block on all plan sheets. Refer to sample on City website. 4)Include construction sequence. Refer to sample on City website. 5)Include General Construction Notes. Refer to sample on City website. 6)The stormwater pump will require a hold harmless agreement. The agreement must be completed prior to final permitting. The agreementwill be provided at a later date. TESC/DEMO PLAN 1)Please show and add a note to the plans that filter socks will be added to catch basins219 and 283 (CB 7-272 and 7-273 on COE GIS). 2)Please show existing utilities on the plan.Remove the proposed utilities from the TESC/Demo plan (water, storm, sewer, etc.). 3)There is an existing noteon the plans that discusses a 4” sewer lateral that would be provided by City of Edmonds should the lateral be found inadequate. Please revise the lateral diameterto 6”. In addition, revise the same note to read “Cut and cap existing sewer lateral at property line”. 4)Add the following note to the plans. “The existing water service is to be disconnected at the water meter. Install a hosebib with an AVB connection at the meter”. 5)Please show the location of the existing residence and driveways. Shade back the proposed residence and driveway. DRAINAGE PLAN 1)Add a note to the plans indicating where the landscape irrigation backflow assembly will be located (if one is proposed). 2)Add a note to the plans indicating where to find the pump detail and design information. 3)Add a note to the plans. “A 2” grind and overlay maybe required on location of utility trenches. A final restoration inspection is required to determine restoration requirements/limits”. 4)Provide the rim elevation of the trenchgrate. 5)Clarify if CB1 and CB2 are grate or solid lid catch basins.Add a calloutto the plans. 6)In the current scenario, stormwater will overflow CB1 before stormwater discharges from the trench grate into Sunset AveN. Please raise the rim elevation of CB1 whilekeepingit a local low pointwithin the driveway. 7)In the current scenario, the basement and underdrain footing drains will be completely submerged. Please lower the “pump on” elevation to at least that of the basement and underdrain footing drain invert elevation. If the sphere pump needs to be pushed deeper, ensure that the bottom of thespherepump tank is outside the zone of influence of the building foundation (relocate sphere pumptankas necessary). 8)The footing drains will be located within the groundwater table per the geotechnical report. Please provide the groundwater seepage rate and ensure the pump rate is greater than the groundwater seepage rate.Includethe groundwater seepage rate on the plans. 9)The plans propose a spherical pump tank. Per the standard information provided within the drainage report, the sphere pump tank has a height of 67”. On the plans, the bottom of the tank is located at elevation 19.00 and the rim is located at 32.00. This is a system with a height of 156”. Clarify how the sphere pump tank will connect the rim to the bottom. Provide a detail if necessary. 10)The height of the sphere tank is 5.4’. There is a difference of 7.27 feet between the main level footing drain invert elevation and the basement underdrainsinvert elevation.Please revise the footing invert elevations of the sphere pump tank. 11)The plans describe two alternating PE31 pumps. The spherical pump tank detail included in the drainage report provides the following sentence; “These tanks are furnished with a manhole covers and include molded-in elevated pump stand on the bottomof the tank”. Confirm with manufacturer that the spherical tank can house two PE31 pumps. 12)Per the details provided online, the sphere pump tank should not be located within groundwater. Per the geotechnical report, there was groundwater encountered between 7.5 feet and 20 feet. Please indicate if the sphere pump is still the desired pump tank option despite manufacturers warning. 13)Per the pumping systems for stormwater conveyance policy, a “packaged” system made from any material less dense than concrete will require an anti-flotation base. Please provide buoyancy calculations for the spherical pump tank and include the anti-flotation base in the Page 2of 3 plan and detail. A copy of the stormwater systems policycan be found online at the City of Edmonds website under Engineering Codes and Design Information.Please see the attached document. The sphere pump tank is to meet the full extent of the policy. 14)Please provide the sphere pump tank operations and maintenancemanual in the drainage report. 15)Please provide a table showing the project grading calculations (cut/fill) on the plans. 16)Ensure a 5’ horizontal separation between storm drains and sewer lines. If a 5’ horizontal separation cannot be achieved, provide a minimum of 18” between the invert of the storm pipe and the crown of the sewer pipe. 17)Please clarify what utilities are in the “UB” box. Include a callout on the plans. 18)Please add a note to the plans that all final restoration shall be completed by the contractor not the City of Edmonds. SEWER/WATER PLAN 1)Please add a note to the plans that indicates the sewer backflow preventer to be doubled as a sewer cleanoutby including a removable flapper.Otherwise, includea separate cleanout within 2’ of the structure. 2)Provide invert elevations at thecleanout at the property line so that a minimum 2% slope and minimum 2’ pipe coveragecan be verified. If the slope of the pipe exceeds 20% the pipe will need to be anchored. If the existing sewer lateral is proposedto be reused, the City’s Public Works Department 3) will need to TV the lateral to determine if it is acceptable to re-use. Add notes to the plans to contact Edmonds Public Works Sewer Division, 425-771-0235, to schedule inspection. STORMWATER REPORT 1)Please specify in the report that the project will adhere to the City of Edmonds 2017 stormwater code. 2)The stormwater drainage report indicates in “Section A: Project Overview” that footing nd drains will “be pumped across the neighbor’s property at 513 2Ave North to the east in a 5’ drainage easement to a catch basin at their easterly property line and then gravity out to the street drainage system in 2nd Ave N”. This is no longer the storm solution, please revise. 3)In the stormwater report, there is the following sentence in Section A: Project Overview. “Detention is not required if the downstream conditions are sufficient to handle the flow”. There is no further discussion surrounding downstream conditions. Please elaboratewhy detention is not required. 4)Under the Hydrologic Conditions Section B, there is a sentence that discusses the storage of stormwater flows. Please add a note to the report that indicates that detention is not required. The footing drains will be located within the groundwater table perthe geotechnical report. 5) Please provide the groundwater seepage ratein thestormwater report. Page 3of 3