Loading...
BLD20170007 - Stormwater Review - 1.pdf Stormwater Review Date of Review: February 7, 2017 th File/Address: BLD20170007 / 8822 218 St SW Reviewer: Robert C. Edwards, PE, Stormwater Engineer, City of Edmonds Background This is classified as a Category 2 Small Site because it proposes impervious area exceeding 5,000 SF. Category 2 Small Site Projects are subject to Small Site Minimum Requirements 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, and 11. TheSupremeCourtofWashingtonissuedarulingonDecember29,2016regardingtheͻǝĻƭƷźƓŭͼ ofStormwaterregulations.ThisrulingupholdstheDepartmentof9ĭƚƌƚŭǤ͸ƭregulationsfor applicationandconstructiondatesforprojectswithStormwaterrequirements. TheCityofEdmondshasendeavoredtoclarifytheimpactsoftherulingand9ĭƚƌƚŭǤ͸ƭ regulationsonapplicationforsubdivisionsandshortsubdivisionssubmittedpriortoJanuary1, 2017.TheDepartmentofEcologyprovidedguidancetotheCityonJanuary30,2017,confirming thatapplicationsforsubdivisionsandshortsubdivisionsacceptedbytheCityofEdmondspriorto January1,2017shallconstituteanapplicationforthedefinitionoftheDepartmentof9ĭƚƌƚŭǤ͸ƭ NPDESPhaseIIpermit.SuchprojectsthatdonotstartconstructionbyJanuary1,2022willbe subjecttothenewDepartmentofEcologyregulations. Consistentwith5h9͸ƭNovember2015clarificationontiming(postedontheirwebsite),thisshall beinterpretedtomeanthatifasubdivisionapplicationisreceivedbytheCitypriortoJanuary1, 2017,thesubdivisionandsubsequentbuildingpermitsfortheindividuallotswillbeallowedto completedesignandconstructionconsistentwiththestormwatermanagementcodeunder whichtheirstormsystemwasdesigned.Ifthesubdivisionincludedrestrictionsorrequirements fortheindividuallots,(e.g.maximumimpervioussurface,LID.at͸ƭΜͲthoserequirementsshould berecordedforeachlotandmustbeenforcedwhentheindividuallotisdeveloped.Again,such projectsthatdonotstartconstructionbyJanuary1,2022willbesubjecttothenewDepartment ofEcologyregulations. ApplicantsarecautionedthattheDepartmentofEcologyhasnotissuedawrittendecisionin supportofthisguidance.Forthisreason,thestormwatercommentsprovidedarepreliminary andsubjecttorevisionshouldtheDepartmentofEcologyissueawrittendecisionthat contradictstheguidanceinitiallyreceivedbytheCity. Minimum Requirement #1 – Preparation of Stormwater Site Plan Comments: 1.Sheet SP-01: Connection to the City’s MS4 allowed at structures only. Plan shows SD line teeing into existing culvert. 2.Sheet SP-01: Show short plat property line between lots Minimum Requirement #2 – Construction Stormwater Pollution Plan Comments: None Minimum Requirement #3 – Source Control of Pollution Comments: None Minimum Requirement #4 – Preservation of Natural Drainage Systems Comments: None Minimum Requirement #5 – Onsite Stormwater Management Comments: N/A - detention Minimum Requirement # 6 – Runoff Treatment Comments: None Minimum Requirement #7 – Flow Control Comments: 1.Sheet DT-02: Minimum diameter for control structure is 54-inches Minimum Requirement #8 – Wetland Protection Comments: N/A Minimum Requirement #9 – Operation and Maintenance Comments: None Minimum Requirement # 10 – Offsite Analysis and Mitigation Comments: None Minimum Requirement #11 – Financial Liability Comments: None