Loading...
bld20170007-Engineering-1.pdf CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: April 11, 2017 TO: Kayla Clark Kayla.clark@outlook.com FROM: JoAnne Zulauf, Engineering Technician Joanne.zulauf@edmondswa.gov RE: Building Permit #: pln20170007 Project: Single Family Residence th Project Address: 8822 218 St SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to an engineering technician. nd Resubmittals can be made at the Development Services Department on the 2 floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. GENERAL th 1.Complete building permit number on all sheets. Revise address to 8822 218. 2.Please reference short plat information. Sheet 1 of 5 – SITE DEVELOPMENT PLAN 3.Please show the lot line proposed by the short plat to verify utility locations on the lot. 4.Call out size of existing sewer line. 5.Add the following sewer notes to the plan. This note refers to the sewer line running from the property line in the access road to the property line of this lot. a. If re-using existing side sewer (from property line to house): Property owner must have condition verified and provide a report to the Public Works Department. 6.Please revise footing drain note under Storm Drainage Notes to reflect project proposal. 7.Footing Drain Trench call out references geotech. No geotech report has been received for this project. 8.There are 4 locations where utilities are crossing.Please identify separation of each cross and add call- out for 20’ sleeve over the water line centered at cross. Water shall be above all utilities, if unable to install water above the crossing utility, line shall be cast iron. 9.Add note to plans: The associated short plat, pln20160025, states the stormwater codes in effect at the time of civil plan approval. This code version shall apply to permits associated with this plan, as long as construction on the plat/subdivision starts prior to January 1, 2022. If construction does not begin prior to this date, the stormwater system for the plat/subdivision shall be redesigned to comply with the codes in effect at that time. Sheet 2 of 5 – GENERAL NOTES & LEGEND 10.Update the General Notes. Add 2005 for DOE version. 11.TESC note #10 refers to a geotech report though none was provided. Please revise. Sheet 3 of 10 – CLEARING, GRADING &TESC . 12.Add note: All disturbed areas to be compost amended per DOE standard BMP T5.13. Sheet 5 of 5 – GENERAL DETAILS 11. Please change the sheet title to Stormwater Details. Page 2 of 2